"Amanda was really very good! At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it. It was very clear that she knew her business and she gave me several ideas that I had not even thought about. I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!
RLSlowman Construction is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.
Building up by adding square footage to the top of your home is often less expensive than adding a basement, but it depends on the specifics of your house, your property, and supply costs. Because building a basement requires excavation, it can be a more expensive option than building up.
The best type of basement ventilation system depends on your budget, the moisture in your basement’s air, and the types of windows you have down there. You should consider all of these factors when choosing a ventilation system. However, the most effective method for basement ventilation is an energy recovery ventilator (ERV) or a whole-house ventilation system, which preheats or precools incoming air from the outside while also managing water vapor.
You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.
Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.
Yes, you can add a door to your basement—it might even be required, depending on building codes in your area and whether or not you’re using the basement as a bedroom. A basement contractor can give you some advice on installation and help you add a door to your basement.
The Round Rock, AZ homeowners’ guide to basement remodels
From average costs to expert advice, get all the answers you need to get your job done.
If your basement ceiling is low, there are ways to raise it. Learn more about the cost to raise a basement ceiling to be able to enjoy your basement and create a more usable space in your home.
Hiring a bad basement remodeler can wreak havoc on the look and longevity of your unfinished space. Here are red flags to look for as you vet basement contractors.