Top-rated excavation pros.

Best excavation pros near Northlake, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Northlake, TX?

Select your specific project to find the pro for you.

TRUSTED BY NORTHLAKE, TX HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon50
    Verified excavation services reviews

Top-Rated Excavation pros in Northlake - Updated Nov 2026

Sonart Construction Corp.
4.8(
245
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessLandscape - Minor Grading or Resloping

Serving Northlake, TX and surrounding areas

Approved

In business since 2013

Free estimates

Credit card accepted

"If you are looking for a solid construction company sonart is the way to go for sure! All I could say was wow aside from the fact that my mouth was completely open for a solid five minutes LOL! The house was built around the 50s and hasnâ t been updated since the original build. To see our bathrooms brought more to a modern the lights was honestly heartwarming I know my mother would have appreciated this!Thank you again guys for your hard work!"
Response time10 hrs
Response rate94%
Recommended by83%of homeowners
Avatar for Epic Lawn Care of DFW
Epic Lawn Care of DFW
5.0(
21
)
Excavation - Major Grading or ReslopingLandscape - Minor Grading or Resloping

Serving Northlake, TX and surrounding areas

Approved

In business since 2023

Free estimates

Credit card accepted

"Gil and his crew took care of all our needs. Tilled bare spots, added enriched topsoil, laid sod, rolled finished sod, tore down junk behind fence, added sprinkler head, checked all sprinklers to ensure full coverage, collected live oak leaves from front yard, etc. We couldn’t be happier."
New Zoysia SOD  installed
New Zoysia SOD installed
New Zoysia SOD installed
New Zoysia SOD installed
New Zoysia SOD installed

+17

Response time6 hrs
Response rate97%
Recommended by95%of homeowners
Avatar for Vio Construction and Landscaping
Vio Construction and Landscaping
4.0(
72
)
Landscape - Minor Grading or Resloping

Serving Northlake, TX and surrounding areas

Approved

In business since 1999

Free estimates

Emergency services offered

"Mr paufisi did a wonderful job on my walkway and back patio. He was fast and efficient. For 4000 they even hauled away the old concrete that had cracked. We are so happy with his work and am looking forward to working with his company again in the future"
My jobs
My jobs
My jobs
My jobs
My jobs

+275

1 neighbors recently requested a quote
Recommended by66%of homeowners
Avatar for Project Simple
Project Simple
5.0(
3
)
Building Site - Preparation and Clearing

Serving Northlake, TX and surrounding areas

Approved

In business since 2020

Free estimates

Emergency services offered

"I needed 2 rooms repainted to the color that I chose. He came in, got everything prepped quickly and painted the rooms very neatly and put back all the cover plates and other fixtures that he?s taken out for the job. Five stars for good work, cleanliness and carefulness!"
Custom built kitchen
Custom built kitchen
Custom built kitchen
Custom built kitchen
Custom built kitchen

+48

...
Showing 1-10 of 437
Excavating FAQs, answered by experts

Professional installers often include a deep layer of crushed gravel under permeable pavers to allow more runoff to soak through into the soil below. Many installations will include multiple layers of gravel, with coarser aggregate at the base and finer aggregate that sits on top of that bottom layer. Above the gravel, you’ll often find coarse sand that helps reduce paver shifting over time. Some permeable paver designs include a water collection system set into the gravel layer to route runoff to a safe area for disposal.

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

Prior to excavation, you should prepare the dig site and call 311 before you sign anything.

To get your site ready for excavation, you should move anything in the area that isn’t affixed to the land. You can save money on the excavation by removing hardscaping, including walkways, decks, concrete patios, and paver patios.

Before you carry out any digging, you should call 311 to confirm that there are no utility lines running through your excavation site. Skipping this step could lead to severe injury and property damage if your excavator hits a water, sewage, or gas line.

How deep your septic system needs to be into the ground depends on several factors. In extremely cold environments, the tank needs to rest below the maximum frost line, which can be up to six or eight feet deep. The standard burying depth for most systems is between a few inches and four feet below ground level. Depth can also depend on the slope of the landscaping and other property variables. 

The average cost of excavation is approximately $3,200, with typical projects ranging from $500 to $15,000. Depending on the contractor, you may be charged between $50 and $200 per cubic yard or an hourly rate of $40 to $180 for an excavation specialist. The total cost is influenced by several factors, including the project size, the amount of soil to be removed, and the soil's condition. Hard soil, tree roots, or excessive rocks and clay can increase the price, potentially adding $200 to $1,200 to the final bill. Other factors that can drive up costs include the presence of nearby structures that complicate the work or tight spaces that require manual excavation instead of heavy machinery.

The Northlake, TX homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.