Top-rated excavation pros.

Get matched with top excavation pros in New Caney, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in New Caney, TX?

Select your specific project to find the pro for you.

TRUSTED BY NEW CANEY, TX HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon74
    Verified excavation services reviews

Find Excavation pros in New Caney

Avatar for Scott's Manicured Lawns
Scott's Manicured Lawns
4.6(
201
)
Landscape - Minor Grading or Resloping

Serving New Caney, TX and surrounding areas

Approved

Super Service Award Winner

In business since 1999

Free estimates

Emergency services offered

"Scott’s team did an excellent job taking out our existing stone patio and walkway, clearing out tree roots and professionally laying it back. They also installed drainage next to patio. Everything looks great!"
Response time1 day
Response rate93%
91 neighbors recently requested a quote
...
Showing 1-10 of 292
Excavating questions, answered by experts

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

As a general rule, the protected area should be about 1½ times as wide as the canopy of the tree’s leaves. This digging measurement can vary by tree species and the age of the tree. Of course, that can be a lot of fencing for larger trees, which is why our first step is about making difficult decisions on which trees to save.

The best way to protect tree roots is to avoid the roots entirely by excavating outside the root radius of the tree. For nearby projects, it’s a good idea to construct a temporary retaining wall. But that’s not always possible, depending on the project and the root system. In these cases, consider using alternative equipment like an auger to tunnel under the ground.

Remember, tree roots can damage nearby cement foundations as they grow. If a tree is close enough to interfere with large excavations, it may be better to remove the tree than risk future problems.

If you don’t have a crawl space but have a partial basement you want to make deeper, you can expect to spend a little less—between $40,000 and $90,000 on average. However, if you’re not adding new finished square footage, you won’t see much in the way of ROI.

The physical constraints of hand-drilling a well limit the depth you can achieve. Manually digging with picks and shovels may only lead to shallow wells of up to 60 feet in depth. To reach greater depths, you need more specialized equipment. The diameter of your well and the tools you’re using will determine how far down you can dig.

The New Caney, TX homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.