Top-rated excavation pros.

Get matched with top excavation pros in New Caney, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in New Caney, TX?

Select your specific project to find the pro for you.

TRUSTED BY NEW CANEY, TX HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon74
    Verified excavation services reviews

Find Excavation pros in New Caney

Avatar for Scott's Manicured Lawns
Scott's Manicured Lawns
4.6(
198
)
Landscape - Minor Grading or Resloping

Serving New Caney, TX and surrounding areas

Approved

Super Service Award Winner

In business since 1999

Free estimates

Emergency services offered

"Scott’s team did an excellent job taking out our existing stone patio and walkway, clearing out tree roots and professionally laying it back. They also installed drainage next to patio. Everything looks great!"
Response time1 day
Response rate93%
83 neighbors recently requested a quote
...
Showing 1-10 of 289
Excavating questions, answered by experts

Depth is not a qualifying component of evacuation. Any human-made cut, cavity, or depression in the earth’s surface is considered excavation. The hole from excavation can be any size, shape, or depth. Excavation is used to create foundations, reservoirs, drainage ditches, and roads. Long, narrow excavations are called trenches and are often used for underground utilities.

No, fire blight does not survive free in the soil but instead is carried through insects, animals, rain, or wind during the spring. Keep in mind that it can also spread on tools, which is why you should always disinfect them in between cuts.

It takes one hour to dig a 10-foot trench by hand. Use a trenching shovel with a sharp tip and a long head. Plan for more time if your soil is heavy or rocky. Consider renting a trencher if you’re digging a long or deep trench or if you have challenging soil or terrain. 

As a general rule, the protected area should be about 1½ times as wide as the canopy of the tree’s leaves. This digging measurement can vary by tree species and the age of the tree. Of course, that can be a lot of fencing for larger trees, which is why our first step is about making difficult decisions on which trees to save.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

The New Caney, TX homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.