Top-rated basement remodelers.

Get matched with top basement remodelers in Bartlett, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Bartlett, TX?

Select your specific project to find the pro for you.

Find Basement remodelers in Bartlett

Wieland Construction
3.9(
10
)

Serving Bartlett, TX and surrounding areas

Approved

In business since 1991

Free estimates

Credit card accepted

"Robert Wieland is a man of integrity, very professional and very knowledgeable. They do everything and they do it with excellence. I have hired n worked with a lot of contractors, but Robert Wieland is #1 on my list and I refuse to hire anyone else anymore, Robert will be my go to contractor. They remodeled my entire house, 4 bedrooms, 3 bathrooms, Kitchen, and laundry room. They demo, they paint, they float, they lay tiles, install lights, plugs, install light switch, install ceiling fans with lights, heater air and light for bathroom. They do everything and they do it with excellence. Robert listens to the customers needs and helps them make better, wiser, and budget friendly decisions. They are very good."
Recommended by100%of homeowners
Avatar for Full Scale LLC
Full Scale LLC
5.0(
1
)

Serving Bartlett, TX and surrounding areas

Approved

Free estimates

Warranties offered

Credit card accepted

"Nate Davis came out on time me repaired the doors in less time than his estimate,He gave me an estimate on repairing damaged siding and repairing and painting a room the work was finished under his estimate I highly recommend him for any remodeling and repairs"
Sky Shower
Sky Shower
2 neighbors recently requested a quote
Camerin
New to Angi

Serving Bartlett, TX and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

I’ve worked in construction since 2016 straight out of high school I currently work for a construction contractor but I am looking to take on other projects and continue to make customers proud , I’m very flexible, reliable and responsive. Very easy to get along with. The company that I currently work for understands that I do side projects, and supports it. U can look us up @ Quality Remodel San Antonio “QRSA” on google. We do residential & commercial, remodeling, doors, windows, walls, paint, ext…… u can also contact me directly at [email protected] & (210)-3269631

5 neighbors recently requested a quote
Avatar for J&J Constructions
J&J Constructions
4.9(
23
)

Serving Bartlett, TX and surrounding areas

In business since 2015

Free estimates

"J&J Construction were professional, personable, and very knowledgeable about assembling furniture! I will definitely hire them again. I will also refer others to J&J Constructions. Satisfied customer!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+23

Response time1 day
Response rate100%
Recommended by95%of homeowners
...
Showing 1-10 of 90
Basement Remodel questions, answered by experts

In many homes, an unfinished basement is an ideal place for an in-ground pool. The concrete floors, protection against water damage, and access to the ground below your home make this a large contender. Speak with a local basement remodeling contractor to ensure your space is right for the large construction.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

Building up by adding square footage to the top of your home is often less expensive than adding a basement, but it depends on the specifics of your house, your property, and supply costs. Because building a basement requires excavation, it can be a more expensive option than building up.

The Bartlett, TX homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.