Top-rated basement remodelers.

Get matched with top basement remodelers in Memphis, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Memphis, TN?

Select your specific project to find the pro for you.

Find Basement remodelers in Memphis

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Memphis, TN and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Elite Home Solutions
Elite Home Solutions
4.3(
7
)
Basement - Remodel

Serving Memphis, TN and surrounding areas

In business since 2014

Free estimates

Emergency services offered

"The workers showed up 15 minutes earlier than expected, they were courteous and worked quickly, they kept area clean and safe, amd kept us informed as the remodel progressed. When issues arose, they would involve us in finding a solution, they finished the remodel on-time and on budget. Very satisfied with the work, and having a FIVE YEAR guarantee on materials and labor is amazing, will recommend to all my neighbors, family and friends. Thanks Elite..."
Recommended by100%of homeowners
Avatar for C.A design services LLC
C.A design services LLC
5.0(
2
)
Basement - Remodel

Serving Memphis, TN and surrounding areas

In business since 2021

Credit card accepted

"We hired Cory to do measurements & create an architectural design plan for our relatively involved home remodel (kitchen, dining room, half bath, and laundry room). Cory was fantastic! He was very flexible and was able to work around our schedules. He was friendly, personable, and very professional. He wasn't bothered at all when my 4-year-old son wanted to talk to him about dinosaurs while taking his measurements. Cory was responsive to feedback & quickly made adjustments to his initial design to meet our needs. I really appreciated his keen eye - with his tips it's far better than we had initially hoped! His fee was very reasonable, better than most other architects we spoke with. I would absolutely hire him again & recommend him to friends!"
Recommended by100%of homeowners
Showing 1-10 of 39
Basement Remodel questions, answered by experts

A finished basement must have a heat and electrical supply with an entrance that meets building code requirements, such as a stairwell to the home's main living space. It often must include finished walls, ceilings, and floors. If the finished basement includes a bedroom, it should have a heat source, an egress window, and a closet.

Remodeling, as opposed to finishing, means altering an already finished basement by adding a bathroom, bedroom, or living area.

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

The Memphis, TN homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.