Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Brighton, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Brighton, TN?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Brighton

Avatar for Climer Striping
Climer Striping
5.0(
2
)
Asphalt Sealing

Serving Brighton, TN and surrounding areas

Approved

In business since 2017

Free estimates

Credit card accepted

"Has great customer service. Did a fantastic job sealing my driveway and would recommend this company to anyone that needs any kind of asphalt maintenance. A very professional company."
My work
My work
My work
My work
My work

+7

Response time12 hrs
18 neighbors recently requested a quote
Recommended by50%of homeowners
...
Showing 1-10 of 83
Asphalt Driveways questions, answered by experts

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

An asphalt overlay or top coat costs between $3 and $7 per square foot. For a standard, single-car driveway that’s 10 feet wide and 20 feet long, that’s a total of between $600 and $1,400. For a two-car driveway, you’re looking at a total of between $1,200 and $3,000.

Think of the street as a way to capture all the elements on either side of the road, including the road—a street encompasses the homes or other buildings, the trees, and the road of a given area as defined by the beginning and end of the street on a map. A roadway, however, is the component of the street where cars travel.

Many asphalt companies have experience with tar and chip paving, but not all. The process is unique enough—and not incredibly common enough—that you may have to look around for a tar and chip specialist. However, speaking with a driveway company is a great place to start, especially if they have experience with multiple materials.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

The Brighton, TN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.