Top-rated driveway sealcoating pros.

Best driveway sealcoating pros near Winner, SD

Enter your zip and get matched with up to 5 pros

Need a pro for your driveway sealcoating project in Winner, SD?

Select your specific project to find the pro for you.

Top-Rated Driveway sealcoating pros in Winner - Updated Nov 2026

Jim Daley
1.0(
1
)
Asphalt Sealing

Serving Winner, SD and surrounding areas

In business since 2019

Free estimates

Credit card accepted

We are a locally owned and operated company. We do Farm and Ranch and Hot Rubber Grain Bin Sealing and Rubberized aluminum roof coating and Houses and Buildings Painting and Asphalt Sealer and Hot Rubber Crack Filling and We offer a with our clients and guarantee your satisfaction! I can be contacted at [email protected] or 806 473 7719 or 901 240 2066 or 806 928 7829

 Jim Daley
 Jim Daley
 Jim Daley
 Jim Daley
 Jim Daley

+12

Driveway Sealcoating FAQs, answered by experts

Yes, they fill all cracks and potholes to ensure a smooth, durable finish that protects the underlying asphalt.

Sealant comes in 5-gallon buckets that can cover up to 400 square feet. Measure your driveway to get the exact square footage, and remember to factor in enough sealant for two coats.

A good rule for all homeowners is to seal every driveway to protect it. Wait at least three months to seal an asphalt driveway and one month to seal a concrete driveway. You know it’s time to reseal your driveway when it shows obvious signs of wear and tear. It may appear as fading or discolored asphalt, small cracks, and oil stains. If you notice that one area of your driveway seems to dry slower than others, it’s time to reseal.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

You should plan on sealing your driveway about once every five years, although you should plan to do it once every three years if your area experiences frequent rain or snow. Sealing your driveway protects it from moisture, UV rays, and chemicals from your car, like motor oil and antifreeze. If you find that your driveway stains easily or appears to be cracking or fading, you may want to schedule a sealing service regardless of when you last sealed it.

The Winner, SD homeowners’ guide to driveway sealcoating

From average costs to expert advice, get all the answers you need to get your job done.