Top-rated driveway sealcoating pros.

Best driveway sealcoating pros near Mina, SD

Enter your zip and get matched with up to 5 pros

Need a pro for your driveway sealcoating project in Mina, SD?

Select your specific project to find the pro for you.

Top-Rated Driveway sealcoating pros in Mina - Updated Nov 2026

Mike and Martin's Asphalt Paving and Sealcoating
4.0(
1
)
Asphalt Sealing

Serving Mina, SD and surrounding areas

In business since 1976

Free estimates

We are a locally owned and operated company that values honesty, integrity and treats your home as if it were our own. We offer a variety of general contractor services that are customizable to each individual project. You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships and guarantee your satisfaction!

Response time8 hrs
Response rate88%
Recommended by100%of homeowners
Driveway Sealcoating FAQs, answered by experts

Many services include sealing as part of the repair process. Confirm with your provider.

You shouldn’t directly paint over an oil stain on your asphalt driveway. While painting over might visually conceal the stain, the oil will continue to damage the driveway. Once you’ve noticed the oil stain, it’s important to thoroughly remove it within the next few months since oil stains only take six months before they begin to damage the structure of your asphalt driveway.

Yes, most services include sealing to protect the finish and enhance durability. Confirm with your provider.

Access to commercial-grade products and equipment, ensuring thorough coverage and long-lasting protection.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Mina, SD homeowners’ guide to driveway sealcoating

From average costs to expert advice, get all the answers you need to get your job done.