Top-rated asphalt driveway pros.

Best asphalt driveway pros near Edgemont, SD

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Edgemont, SD?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Edgemont - Updated Nov 2026

Showing 1-10 of 25
Asphalt Driveways FAQs, answered by experts

Many asphalt companies have experience with tar and chip paving, but not all. The process is unique enough—and not incredibly common enough—that you may have to look around for a tar and chip specialist. However, speaking with a driveway company is a great place to start, especially if they have experience with multiple materials.

With proper maintenance, asphalt milling driveways can last 30 years or more. Over time, you’ll need to regularly sealcoat your driveway. You should also have your driveway inspected every few years and make any repairs as soon as they are necessary; this will prolong the lifespan of your driveway.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Edgemont, SD homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.