Top-rated basement remodelers.

Best basement remodelers near North Augusta, SC

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in North Augusta, SC?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in North Augusta - Updated Nov 2026

Morning Star Construction LLC
5.0(
8
)
Basement - Remodel

Serving North Augusta, SC and surrounding areas

Approved

In business since 2014

Free estimates

Warranties offered

"I would highly recommend Morningstar Construction. Denis was a great contractor and his assistant Allen were a joy to work with. Our remodeling project kept growing and Denis would offer suggestions that were reasonable and often added value and beauty to the house. Before and after pictures say it all."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+56

Response time5 days
Response rate100%
2 neighbors recently requested a quote
Ted Clark Construction
5.0(
6
)
Basement - Remodel

Serving North Augusta, SC and surrounding areas

Approved

In business since 1974

Free estimates

Emergency services offered

"Very well . Ted Clark is very skilled and knowledgeable when it come to remodeling and repairs. He did a great job on the deck railings and stairs. The quality of work he provides shows he has a lot of experience in residential construcrion."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+7

Response time1 day
2 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving North Augusta, SC and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 34
Basement Remodel FAQs, answered by experts

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

While bathrooms and kitchens are nearly equal in terms of renovation difficulty, kitchens are the most challenging. Kitchen design, layout, electrical, and plumbing needs all depend on each other for the success of the entire project, and mistakes early in the project can cause trouble later on.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Yes, you can add a door to your basement—it might even be required, depending on building codes in your area and whether or not you’re using the basement as a bedroom. A basement contractor can give you some advice on installation and help you add a door to your basement.

The North Augusta, SC homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.