Top-rated generator install pros.

Get matched with top generator install pros in Martin, SC

Enter your zip and get matched with up to 5 pros

Need a pro for your generator install project in Martin, SC?

Select your specific project to find the pro for you.

Find Generator install pros in Martin

Avatar for The Home Depot - Generators
The Home Depot - Generators
2.5(
1
)

Serving Martin, SC and surrounding areas

In business since 2003

Free estimates

Small jobs welcome

Today, we're proud to be the world's largest home improvement retailer. In 2,300 stores across North America, we aspire to excel in service – to our customers, associates, communities and shareholders. That's what leadership means to us. That's The Home Depot difference.

Generators
Generators
Generators
Generator
Generators

+5

Avatar for Menace Electric
Menace Electric
New to Angi

Serving Martin, SC and surrounding areas

Welcome to Menace Electric electrical services — your trusted local electrician for reliable, high-quality electrical work.\n\nI’ve proudly owned and operated this small business for a little over two years, providing dependable electrical services to homeowners and businesses in our community. As a detail-oriented electrician, I take pride in delivering safe, efficient, and professional results on every project — no shortcuts, no compromises.\n\nWhether you need residential wiring, lighting installation, panel upgrades, troubleshooting, or maintenance, I’m committed to providing honest work, fair pricing, and top-tier craftsmanship.\n\nAt Menace Electric, customer satisfaction and safety is our top priority. I look forward to continuing to grow with the community and being your go-to electrician for years to come.\nAs always, we look forward to seeing you. ~ Dawson Robnett.

Generator Install questions, answered by experts

Potential benefits of using a natural gas generator include reducing your carbon footprint, lower likelihood of carbon monoxide exposure, budget-friendly operating costs, and low-maintenance, continuous fuel supply. Some possible drawbacks, though, include higher initial installation costs, dependency on a natural gas supply, and installation complexity. Keep in mind that pros and cons will vary based on the type and brand of natural gas generator. 

You can determine what size generator you need for a transfer switch by matching the switch to the largest outlet on your generator. Larger generators can power up to 10 circuits, while most 5,000-watt generators can provide power to six circuits. So, if your generator’s largest outlet is 30 amps, you’ll need a 30-amp transfer switch.

It might seem counterintuitive, but installing a generator transfer switch will save you money in the long run. While you’ll have to pay between $400 and $2,500 to have the transfer switch installed, you’ll recoup that amount later on when you don’t have to pay for expensive repairs to your appliances, devices, and electrical system that may have burned out, overloaded, or stopped working due to a sudden loss of power or an incorrect hook up of a generator to your home

The average cost to install a home generator is $5,200, but total costs can range from $500 to $18,000 or more. The final price depends on several factors, including the generator's size, type, brand, fuel source, and the cost of labor and assembly. The generator's size is the most significant cost factor, as units that can power larger homes with higher energy demands cost more.

Cost breakdowns by generator type are typically as follows:

  • Portable or Emergency Backup Generators (1kW–7.5kW): $500–$2,000

  • Partial-Home Generators (9kW–20kW): $2,000–$6,500

  • Whole-House Generators (22kW–48kW): $5,000–$18,000

To ensure you get the right size unit for your needs without overpaying, consider hiring an electrician to calculate the electrical load of your essential appliances. It is also recommended to get at least three quotes from qualified installers to find the best fit for your budget.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

The Martin, SC homeowners’ guide to generator installs

From average costs to expert advice, get all the answers you need to get your job done.