Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Kingstree, SC

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Kingstree, SC?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Kingstree

Avatar for RR&D Construction, LLC
RR&D Construction, LLC
New to Angi
Interlocking Pavers for Driveways & Floors - Install

Serving Kingstree, SC and surrounding areas

Approved

Free estimates

Warranties offered

Small jobs welcome

RR&D Construction, LLC has been proudly serving residential and commercial clients since 2019, providing professional construction services tailored to each project’s needs. With a strong emphasis on craftsmanship, efficiency, and attention to detail, we manage every job with care from start to finish. Our commitment is to deliver durable, well-built results that add value to every property we work on.

CUSTOM FENCE
Ccs handyman
New to Angi
Gate for Driveway or Security - Install or Replace

Serving Kingstree, SC and surrounding areas

Approved

Free estimates

My names Cayden Shadoan, I’m 23 years old. I have a beautiful wife and daughter. I have a full time job as a pipe welder in Sumter South Carolina. I’m on here just looking to pick up a couple extra jobs here and there in hopes of starting my own business one day to be able to stay home with my family more. I can do pretty much anything that needs done in or around your house. Specializing in building fences or repairing fences, any kind of piping jobs, or any welding. Thank you for considering me to help you get what you need done. Hope to see you soon.

...
Showing 1-10 of 83
Asphalt Driveways questions, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Asphalt is made of aggregate materials (sand, rocks, and gravel) and bitumen, a viscous, petroleum-based, waterproof substance. These materials are mixed together at extremely high temperatures to form asphalt.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

Yes, a paved or repaved driveway can boost your home's value by increasing its curb appeal and the functionality of your outdoor space. A new driveway can add anywhere from $5,000 to $20,000 to a property's value. An old, crumbling driveway can be a red flag for potential buyers and inspectors.

The amount of value added depends on the materials used, the design, and local market conditions. Concrete is often cited as adding the most value due to its long lifespan, though asphalt may be more desirable in colder climates. The return on investment is greatest when replacing a driveway that is in poor condition; repaving a driveway that is already in good shape will not yield as significant an increase in value.

The Kingstree, SC homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.