Top-rated subcontractors.

Get matched with top subcontractors in Block Island, RI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Block Island, RI?

Select your specific project to find the pro for you.

TRUSTED BY BLOCK ISLAND, RI HOMEOWNERS

  • Average homeowner rating star icon5
    Average homeowner rating
  • Verified reviews icon11
    Verified subcontracting services reviews

Find Subcontractors in Block Island

Avatar for Custom Construction Services LLC
Custom Construction Services LLC
5.0(
20
)
Major Home Repairs (General Contractor)

Serving Block Island, RI and surrounding areas

Approved

In business since 2010

Free estimates

Emergency services offered

"They did a fantastic job responding and a scheduling the job quickly. It was an old ceiling that had started to fall down from water damage, so I was happy how quickly they were able to turn it around. Looks good as new now! Both Derek and Jerry were very professional, arrived on time, finished early, and were great to work with. Would definitely recommend and plan to rehire for any future plastering projects."
Home Addition
Bathroom Remodel
Bathroom remodel
Exterior House Paint Project
New Deck Build

+245

Response time4 hrs
Response rate100%
7 neighbors recently requested a quote
Sonart Construction Corp.
2.3(
7
)
Major Home Repairs (General Contractor)

Serving Block Island, RI and surrounding areas

Approved

In business since 2013

Free estimates

Credit card accepted

"I recently had my shingle roof replaced and I?m very happy with the results. The team was professional, punctual, and completed the job efficiently. The quality of the work is excellent, and the new roof looks great. They kept the work area clean and communicated well throughout the process. I would definitely recommend them to anyone needing a roof replacement."
Avatar for McKinley & Barron Contracting
McKinley & Barron Contracting
5.0(
14
)
Major Home Repairs (General Contractor)

Serving Block Island, RI and surrounding areas

In business since 2020

Credit card accepted

"We’ve used McKinley & Barron Contracting for several projects on our newly purchased fixer upper. A laundry room remodel, a new shed, and bathroom finish work to name a few. There was nothing they couldn’t do. We're overly satisfied with their work, will be using for future projects, and highly recommend hiring them."
Addition and Kitchen remodel
Addition and Kitchen remodel
Addition and Kitchen remodel
Addition and Kitchen remodel
Addition and Kitchen remodel

+37

Recommended by100%of homeowners
Avatar for The BullBag
The BullBag
5.0(
15
)
Major Home Repairs (General Contractor)

Serving Block Island, RI and surrounding areas

In business since 2001

Credit card accepted

"It was so much easier than getting a dumpster. I paid less money than if I had gotten a dumpster because a dumpster charges by weight and since it snowed and rained, everything in the bag was wet - I would have paid a fortune!!! With the bullbag, I paid one set price and the cool part: I got the bag back to refill again and again. This company also recycles most of what is collected so less ends up in a landfill.
No better business bureau complaints.
One set price to empty.
I get to reuse the bag over and over."
The BullBag truck in MA
The BullBag truck in NY
Toys for Tots
Recommended by100%of homeowners
Avatar for JJJ construction
JJJ construction
4.3(
111
)
Major Home Repairs (General Contractor)

Serving Block Island, RI and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"Mr. Cardilli subcontracts his work out and oversaw the construction. He helped us figure out what to present to the insurance company so that the majority of the work done was eventually covered by our home owner's policy. He was in constant contact throughout the project. He helped us develop a plan that allowed us to remain in the house during construction except for the floor refinishing. This was an important factor for us. 
He remained in constant contact with us about the process, what we needed to do and by when. He checked in on the job daily either by phone or site.  The construction crew he hired was excellent. They were very thorough in their daily clean up of the house including little conveniences like plugging in alarm clocks and setting them to setting up our beds in other rooms during construction.  The painting crew was good, but work needed to be checked for thorough paint coverage. We found paint on bed spreads, curtains, and floor.  They did not clean up as well as the carpenters. The flooring crew completed their job within the given time frame and the work was excellent. All work was completed within the expected time line. 
This was the first time we have ever hired a contractor to do work for us. I will add a couple of things we learned in the process. If you want / need an itemized list of all work and materials used, put that expectation in the contract. Additionally request that any work beyond the agreed upon work is approved (cost) prior to starting the needed work. When the additional work is done, check the work and time required for labor to be sure it is accurate.
Overall this experience was a good one. The subcontractors were polite and pleasant to our family. Mr. Cardilli was attentive and responsive to all our emails and calls.
"
Recommended by92%of homeowners
...
Showing 1-10 of 80
Subcontractors questions, answered by experts

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

Check reviews, compare quotes, and verify licensing. Ensure the builder has experience with modular construction.

Craftsman houses’ sustained popularity is likely due to their timelessly beautiful design and simplicity. To this day, they hold true to the power of hard work and refined craftsmanship and how that’s all you need to create a beautiful home.

You don’t have to commit to a complete home renovation to age in place comfortably—those can get pricey. Instead, focus on a few impactful changes. Consider adding a stair lift or installing ramps to eliminate barriers. Upgrading to non-slip flooring can prevent falls while adding brighter lighting can improve visibility throughout your home. These thoughtful updates can make your home much easier to navigate and enhance your comfort and safety without the stress and cost of a complete overhaul.

The process typically takes 2-6 weeks, depending on the project size and level of customization.

The Block Island, RI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.