"When Zane first answered my query about doing this tile job he was extremely communicative the entire time as we planned the job. He said he had an opening in just a few days if I could make my decisions about exactly what I wanted, He arrived this morning, did a great set up to keep the room clean through the process, the two of us discussed a couple approaches to the project and then he proceeded to work hard all day to bring it to fruition. I would recommend Zane to anyone who needs a home remodeling project."
"These guys were so friendly, easy to talk to, made great suggestions, took their time and their work was meticulous. I am hiring them to do even more work for me. Highly recommended."
"I filled out the HomeAdvisor application for carpet install. Johnny carpet call me back the next day. They gave me a quote over the phone then were there the next day. From application on the web to installation of my carpet was less than 48 hours. Very good service. Very nice people"
"Found Rock-A-Fellas on Angies List and I'm glad I did. Bob examined thoroughly and patiently explained the construction flaws in the carport built in the rear of my home by another contractor back in 2009. Because the original contactor did not follow standard building codes and use proper construction techniques and materials, I was cited by the City of Philadelphia. Bob spoke to the Licenses and Inspections Inspector and tried very hard to figure a way to save the carport. Unfortunately, due to the poor prior construction, demolition was the only option left to me.
Bob and his three man crew arrived 30 minutes early and for the next three and a half hours methodically and carefully removed the carport, which included a roof and sides. I was very impressed with their attention to detail such as avoiding damaging the power and cable lines, reassembling the downspout, tying back the power lines after the demolition was over/
After the demolition was over, you couldn't tell there was ever a structure.
I hired Rock-A-Fellas to remodel/reconstruct my nephew's bedroom, which had termite and moisture damage. I'm also considering having Bob and his crew do a complete remodel of my kitchen, basement, and a new carport.
This was my best experience with a contractor. I give Rock-A-Fellas an A+++++ rating. "
"Gino's crew did a great job with the new siding and other features. His employees work well together and were very helpful with suggestions. The siding looks great and I am quite happy with the job performed. "
"We wanted to update our bathroom so we had a new double bowl vanity replace our old single bowl one. The existing one and the wall and the flooring needed repaired to fit the new one with new backsplash and baseboard as well. It was done seamlessly and efficiently. We would not hesitate to use West Fulton Contacting for any work that would need to be done in our home. Nick was very kind, respectful and paid attention to detail.
Rick and Linda V."
Backsplash Installation questions, answered by experts
Per the International Code Council, walk-in shower floors should have a minimum slope of 1/4-inch per foot (or a 2% slope) towards the drain. The slope should be no steeper than 1/2-inch per foot (or a 4% slope). This helps safely direct water into the drain rather than all over your bathroom.
The difference between floor and wall tiles is that floor tiles generally have higher strength and porosity ratings than wall tiles. Wall tiles are typically weaker and more likely to crack or become damaged under sustained pressure like high foot traffic.
For this reason, avoid using wall tiles on floors and vice versa.
When working on your bathroom floor tiling, you should always tile the floor first and then refit the toilet afterward. This has both practical and visual advantages—the tile will have a better seal, and the installation will look cleaner.
On the other hand, when you try to cut the tiles to fit around the toilet, you’re putting yourself at a disadvantage. It’s a lot more work, it’s hard to be precise, and mistakes or miscalculations can lead to future moisture damage to the tiling, grout, and subfloor.
Yes, tile floor removal is a physically demanding project that takes between eight and 12 hours per 100 square feet. It also requires protective gear and closing the area off with construction-grade plastic sheeting to avoid dust and damage to other parts of your home.
While tile is the best option in the bathtub, don’t forget to consider the flooring around the wash station. Moisture-holding carpet is a no-no, but is tile or vinyl better for dogs? Tile flooring is tough, moisture-resistant, cool, and scratch-proof. However, it’s more tricky to install and costs more than vinyl flooring. If you opt for vinyl, select tough luxury vinyl flooring; otherwise, canine claws could quickly damage the surface of standard, budget vinyl.
The Worthington, PA homeowners’ guide to backsplash installation services
From average costs to expert advice, get all the answers you need to get your job done.
When installing a kitchen backsplash, you’ll need the right tools, materials, and knowledge. Our guide will show you how to install a kitchen backsplash.