"When Zane first answered my query about doing this tile job he was extremely communicative the entire time as we planned the job. He said he had an opening in just a few days if I could make my decisions about exactly what I wanted, He arrived this morning, did a great set up to keep the room clean through the process, the two of us discussed a couple approaches to the project and then he proceeded to work hard all day to bring it to fruition. I would recommend Zane to anyone who needs a home remodeling project."
"These guys were so friendly, easy to talk to, made great suggestions, took their time and their work was meticulous. I am hiring them to do even more work for me. Highly recommended."
"I filled out the HomeAdvisor application for carpet install. Johnny carpet call me back the next day. They gave me a quote over the phone then were there the next day. From application on the web to installation of my carpet was less than 48 hours. Very good service. Very nice people"
"Found Rock-A-Fellas on Angies List and I'm glad I did. Bob examined thoroughly and patiently explained the construction flaws in the carport built in the rear of my home by another contractor back in 2009. Because the original contactor did not follow standard building codes and use proper construction techniques and materials, I was cited by the City of Philadelphia. Bob spoke to the Licenses and Inspections Inspector and tried very hard to figure a way to save the carport. Unfortunately, due to the poor prior construction, demolition was the only option left to me.
Bob and his three man crew arrived 30 minutes early and for the next three and a half hours methodically and carefully removed the carport, which included a roof and sides. I was very impressed with their attention to detail such as avoiding damaging the power and cable lines, reassembling the downspout, tying back the power lines after the demolition was over/
After the demolition was over, you couldn't tell there was ever a structure.
I hired Rock-A-Fellas to remodel/reconstruct my nephew's bedroom, which had termite and moisture damage. I'm also considering having Bob and his crew do a complete remodel of my kitchen, basement, and a new carport.
This was my best experience with a contractor. I give Rock-A-Fellas an A+++++ rating. "
"Gino's crew did a great job with the new siding and other features. His employees work well together and were very helpful with suggestions. The siding looks great and I am quite happy with the job performed. "
"We wanted to update our bathroom so we had a new double bowl vanity replace our old single bowl one. The existing one and the wall and the flooring needed repaired to fit the new one with new backsplash and baseboard as well. It was done seamlessly and efficiently. We would not hesitate to use West Fulton Contacting for any work that would need to be done in our home. Nick was very kind, respectful and paid attention to detail.
Rick and Linda V."
Backsplash Installation questions, answered by experts
Most professional shower tile installations take between six and eight hours, depending on the size and complexity. Most projects get completed in a single workday. DIY-ing the project takes around three to four days or roughly 16 hours. However, this will vary based on the skill level of the person completing the work.
Many homeowners have successfully retiled a bathroom themselves. It can be a challenging but rewarding process, but it’s best for someone who already has at least intermediate DIY skills.
Yes, you can install a backsplash directly onto drywall, provided the wall is properly prepped, clean, and dry. For best results, especially in kitchen areas, your walls should be made of moisture-resistant drywall, often called green board. If your current wall isn't moisture-resistant, it's recommended to replace it before installing the backsplash. For even greater protection against water damage, you can remove the existing drywall and install a tile backer board or cement board instead. While properly installed standard drywall is typically strong enough to support a backsplash, some local building codes may require water-resistant materials in kitchen areas, so it's a good idea to check.
Tile floor installation usually takes about 16 hours of active work along with a couple of days of drying time between tile and grout applications.
The amount of time it takes your installer will depend on many factors, including the square footage of the space, the tile material type, and if they need to make intricate tile cuts.
The best bathroom floor tiles are strong enough to withstand the weight of a clawfoot tub. However, professional tile installation is essential. If the tiles are uneven or improperly fixed, they may crack under the pressure. Be careful when installing the tub—if it drops or drags on the tiles, it could easily cause scratches or cracks.
The Worthington, PA homeowners’ guide to backsplash installation services
From average costs to expert advice, get all the answers you need to get your job done.
When installing a kitchen backsplash, you’ll need the right tools, materials, and knowledge. Our guide will show you how to install a kitchen backsplash.