"When Zane first answered my query about doing this tile job he was extremely communicative the entire time as we planned the job. He said he had an opening in just a few days if I could make my decisions about exactly what I wanted, He arrived this morning, did a great set up to keep the room clean through the process, the two of us discussed a couple approaches to the project and then he proceeded to work hard all day to bring it to fruition. I would recommend Zane to anyone who needs a home remodeling project."
"These guys were so friendly, easy to talk to, made great suggestions, took their time and their work was meticulous. I am hiring them to do even more work for me. Highly recommended."
"I filled out the HomeAdvisor application for carpet install. Johnny carpet call me back the next day. They gave me a quote over the phone then were there the next day. From application on the web to installation of my carpet was less than 48 hours. Very good service. Very nice people"
"Found Rock-A-Fellas on Angies List and I'm glad I did. Bob examined thoroughly and patiently explained the construction flaws in the carport built in the rear of my home by another contractor back in 2009. Because the original contactor did not follow standard building codes and use proper construction techniques and materials, I was cited by the City of Philadelphia. Bob spoke to the Licenses and Inspections Inspector and tried very hard to figure a way to save the carport. Unfortunately, due to the poor prior construction, demolition was the only option left to me.
Bob and his three man crew arrived 30 minutes early and for the next three and a half hours methodically and carefully removed the carport, which included a roof and sides. I was very impressed with their attention to detail such as avoiding damaging the power and cable lines, reassembling the downspout, tying back the power lines after the demolition was over/
After the demolition was over, you couldn't tell there was ever a structure.
I hired Rock-A-Fellas to remodel/reconstruct my nephew's bedroom, which had termite and moisture damage. I'm also considering having Bob and his crew do a complete remodel of my kitchen, basement, and a new carport.
This was my best experience with a contractor. I give Rock-A-Fellas an A+++++ rating. "
"Gino's crew did a great job with the new siding and other features. His employees work well together and were very helpful with suggestions. The siding looks great and I am quite happy with the job performed. "
"We wanted to update our bathroom so we had a new double bowl vanity replace our old single bowl one. The existing one and the wall and the flooring needed repaired to fit the new one with new backsplash and baseboard as well. It was done seamlessly and efficiently. We would not hesitate to use West Fulton Contacting for any work that would need to be done in our home. Nick was very kind, respectful and paid attention to detail.
Rick and Linda V."
You cannot tile directly over hot mop waterproofing because tile requires a smooth, solid surface to adhere properly. Additionally, the shower bed pan needs to be raised and sloped toward the drain to prevent water from pooling. However, you can hot mop and apply a sloped mortar bed over the top (to which the tile can then be adhered).
The rule tells you how to cut tile to install it in a corner. The 3/4/5 rule recommends that you should have 3 feet across on one straight line, four feet on the other perpendicular line, and 5 feet of length from the end of one of the lines to the other. You’re making a right triangle with the tile, and the hypotenuse (the line across from where the 3-foot lie and 4-foot line meet) should be 5 feet long.
On average, tiling a bathroom involves about 12 hours of labor, usually spread over two to three days to accommodate prep work and curing times. A professional tiler can often complete the installation in 6 to 8 hours, whereas a DIYer might take 10 to 16 hours. The total project time is influenced by factors like the bathroom layout, tile type, and necessary prep work, such as removing old tile. The process includes specific timelines for different areas; for example, tiling a floor takes about six hours, while a shower area can take six to ten hours. It is essential to allow for adequate curing time—typically 24 hours each—for the mortar, grout, and caulk, which is why the project extends over several days.
Updating your backsplash without removing the tile is possible in a couple of different ways. First, you can remove the old grout and replace it with new grout to give your backsplash a fresh look. You can also change the grout color, which can have a surprisingly large impact on the final appearance of the backsplash. Finally, you can paint the original tile to totally change the look of the backsplash without removing it.
Terracotta tile is a broad term for clay tile that’s been fired in a kiln, and Saltillo tile is a specific type of terracotta tile produced in Saltillo, Mexico. In addition to Saltillo, terracotta tile comes in a range of other shades and styles. You’ll often find it used in buildings throughout Mexico, southern Europe, and the western United States.
The Worthington, PA homeowners’ guide to backsplash installation services
From average costs to expert advice, get all the answers you need to get your job done.
When installing a kitchen backsplash, you’ll need the right tools, materials, and knowledge. Our guide will show you how to install a kitchen backsplash.