Top-rated excavation pros.

Get matched with top excavation pros in Milton, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Milton, PA?

Select your specific project to find the pro for you.

Find Excavation pros in Milton

Avatar for Stemler Services LLC
Stemler Services LLC
5.0(
7
)
Landscape - Minor Grading or ReslopingBuilding Site - Preparation and ClearingExcavation - Major Grading or Resloping

Serving Milton, PA and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Emergency services offered

"Went way above and beyond! Helped finish work that was being done in our living room. Cleaned up every piece of material that was utilized and made sure that everything was 100 percent to our satisfaction. Highly recommend for any job you need accomplished as he truly does go above and beyond!"
Our Team
Our Team
Our Team
Our Team
My Jobs

+24

Response time2 hrs
Response rate97%
6 neighbors recently requested a quote
Avatar for Cherry Excavating
Cherry Excavating
5.0(
10
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+1 more

Serving Milton, PA and surrounding areas

In business since 2021

Free estimates

Credit card accepted

"Cherry Excavating did a fantastic job preparing the site for construction of my 40' x 52' building. They removed several trees, stripped top soil, hauled fill, dug all footers and ditches for electric lines, and final graded after construction. Everything turned out great and I would highly recommend them for all of your excavation needs."
Response time1 day
Recommended by100%of homeowners
DMS Excavation and Retaining Wall
5.0(
3
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For Business

Serving Milton, PA and surrounding areas

In business since 2018

Free estimates

Emergency services offered

"We hired Dave to remove some ballast and dirt from a staged testing area we had set up to test switch machines here at Amtrak. They arrived on time and completed the job ahead of schedule despite some unforeseen obstacles. Highly recommend."
Response time3 days
Recommended by100%of homeowners
Avatar for Buddy's Quality Construction LLC
Buddy's Quality Construction LLC
5.0(
2
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Milton, PA and surrounding areas

In business since 2024

Free estimates

Emergency services offered

"This was by far the best business that I have ever dealt with. They called me every day and kept me informed of their progress. They did a fantastic job and went above and beyond what I expected. I will recommend this company to everyone and will DEFINITELY use them again for any future projects."
Debris to be removed
Damaged concrete pad
New sidewalk
Excavator using hydraulic hammer to break out shale for pad placement.
Handymen Project

+75

Recommended by100%of homeowners
...
Showing 1-10 of 60
Excavating questions, answered by experts

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

There are several different factors that influence how long it takes to excavate. For a foundation, it could take anywhere from three days to three weeks. It can take even longer if you face weather-related delays or an inaccessible site that’s riddled with boulders and rough terrain. It may also take longer if you have clay soil, which is more difficult to dig.

In the United States, a depth of 36 inches (three feet) for underground water lines is the accepted industry standard. This depth varies from location to location based on local conditions. In areas with colder winters, they may be buried deeper to prevent frozen well water pipes : This is usually at least six inches below the frost level. The International Plumbing Code calls for a minimum of 12 inches below grade.

A walk-behind trencher can cut through roots as long as they’re not too thick, making a project much easier than digging with a shovel and other hand tools. Assess your terrain and the number of trees in the surrounding area to determine if a walk-behind trencher will ease the job. Digging a trench by hand is much more time-consuming and labor-intensive. 

Prior to excavation, you should prepare the dig site and call 311 before you sign anything.

To get your site ready for excavation, you should move anything in the area that isn’t affixed to the land. You can save money on the excavation by removing hardscaping, including walkways, decks, concrete patios, and paver patios.

Before you carry out any digging, you should call 311 to confirm that there are no utility lines running through your excavation site. Skipping this step could lead to severe injury and property damage if your excavator hits a water, sewage, or gas line.

The Milton, PA homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.