Top-rated siding pros.

Best siding pros near Homer, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your siding service project in Homer, PA?

Select your specific project to find the pro for you.

Top-Rated Siding pros in Homer - Updated Nov 2026

Avatar for Eco Builder Services Co
Eco Builder Services Co
3.9(
46
)
Metal Siding: Install or Completely ReplaceMetal Siding: Repair or Partially ReplaceSiding Installation or Repair+4 more

Serving Homer, PA and surrounding areas

In business since 2006

Free estimates

Emergency services offered

"
  • Met with Gino early June. Original contact with him (he called) was 3 hours after my email on a Sunday! Met with him several times going over what we wanted, gave him architectural drawings of the deck and discussed materials to be used. We had some concerns over attaching such a large structure to the house and wanted to be sure we would have no problems with it shifting or collapsing and to make sure the weight bearing was addressed with all posts etc. He was great to deal with, able to reach easily and quick to sign the contracts and pick up the deposit. I called 3 references, all glowing. All stated Gino's men worked from 7:00am to 7:00pm and finished the jobs in the assigned time and quality of work was excellent. 2 were repeat customers and some even referred him to their friends and actually he was on those additional jobs then. Sounded GREAT!
  • Contracts signed 6-22-12
Promised start date 7-16-12 and quoted a 10-14 day job. The only item not included in our original plans was the railing. We changed our minds and added the railing to the bid on 7-17-12 and paid for supplies and labor for this addition in full. Not once did Gino mention this may cause an extension on the original 10-14 day job time.
Promised start date delayed a week to 7-23-12. No one showed up. We had to call him to see what was going on! He then promised they would be there on 7-25-12, no one showed. FINALLY they showed up on 7-28-12. He offered NO explanation at that time.  
His employees would not show up for days with no explanation. Weather was cooperative. I found the prIncipal problem to be inexperienced employees with little to no supervision, they seem unsure as to what to do. Some errors in work were so obvious I noticed them! All issues we pointed out were corrected promptly.   
Here is a timeline of the work done using my dated photographs as a reference so as to be fair and accurate: 
July 28th-siding removed (3/4 of the back of my home is exposed to the elements). Holes being dug for sonna tubes. (note-they did have to dig in bedrock and actually needed jackhammers for a few of them).
August 3rd-sonna tubes in. 3 long beams in for the base of the deck (extending to the back from the house).
August 7th-framing has been done for the second time. First time they had such a bow in it that a foreman ripped it out and redid it in a day! 
August 13th-started roof beam frame. 
August 15th-roof frame complete.
August 20th-shingles on the roof complete-more siding removed.
August 22-face of the roof completed. (triangle part now solid)
August 25th-face of the roof now has scalloped siding 
August 28th-inside of roof framed for soffit.
August 30th-2 of the 3 columns up, 14 X 22 section of decking almost complete.
August 31st-all decking down, 3 columns done- still no siding on my house. We have been having major water damage to the interior of our home due to heavy rainfall and no siding. Spoke with GIno about our concerns but still no finish date set.
September 7th-railing 3/4 done, still missing siding and steps. 
September 13th railing complete, still needs soffit work and gutters. Siding now beginning to be being replaced but it has been almost 2 months without siding!
September 21st-soffit work completed. Siding is on and has been cleaned with a pressure washer.  Finally able to place my recently purchased furniture (June) onto my deck. Still needs lattice work completed but at least now I can sit on my deck (in a jacket!) Just in time to put the furniture away for the winter!
October 3rd-lattice work complete. Deck finally finished.
 To sum up my experience with Gino and ECO Builder Services:
 The end result was a beautiful deck. He always returned our calls even when he knew we were upset or angry. 
  
What I did not like
The time promised for the job (10-14 days) did not equal the time it took to finish the job! (82 total days/60 work days if you count Monday to Friday).
 When I addressed this with Gino I was met with rude comments, him hiding behind 2 separate contracts of 10-14 days , plus the add on contract (for items he neglected to include in the original bid!) 5-7 days and stating the times listed for each job were consecutive.  While I understand weather may play a part in missing some days here and there, I can assure you that the weather was the least of it. Lack of appropriate workers on site was always the problem.
 
I did not appreciate being bumped for more "important" clients and being the subject of his poor time management skills. Spending $19,000 on a deck and not being able to use it for an entire year is not what I had in mind back in mid JUNE.


"
Recommended by64%of homeowners
Avatar for DC Exterior LLC
DC Exterior LLC
5.0(
2
)
Wood or Fiber-Cement Siding - Install or Completely ReplaceWood or Fiber-Cement Siding - Repair or Partially Replace

Serving Homer, PA and surrounding areas

In business since 2020

Free estimates

Offers commercial services

"Very good company,new what l needed to fix my Hardie siding and did a great job They told me when they could get there and they were 1 day late but they called me and told me that they where running behind but they were there the next morning"
New construction Hotel
Dunkin repair
Dunkin repair
Response time10 mins
Recommended by100%of homeowners
Daryls Home improvement
5.0(
2
)
Metal Siding: Install or Completely ReplaceMetal Siding: Repair or Partially ReplaceSiding Installation or Repair+4 more

Serving Homer, PA and surrounding areas

In business since 1990

Free estimates

Emergency services offered

"Still in progress.  Happy thus far with completion pending.  Personable and trustworthy.  We have used him for a closet remodel earlier and have seen his work in friends condos.  Have had no issues with quality to date."
Recommended by100%of homeowners
Howard's Home Improvement
5.0(
2
)
Metal Siding: Repair or Partially ReplaceVinyl Siding - Install or Completely ReplaceVinyl Siding - Repair or Partially Replace+1 more

Serving Homer, PA and surrounding areas

In business since 1989

Free estimates

Warranties offered

"The owner went out of his way to meet me on a Saturday. The work is being done on my mother's home and he has made my mother feel very comfortable. He was very professional and understanding of our needs. He has just started some of the work on the house and will be working there after Christmas."
Recommended by100%of homeowners
Showing 1-10 of 17
Siding FAQs, answered by experts

Yes, insulated vinyl siding increases the R-value of your home. Depending on the quality and brand of the insulated vinyl, you can get an R-value that is up to 5 times greater than traditional vinyl siding. This can be fantastic for homeowners who are trying to lower their utility costs.

The living space of a home doesn’t correlate directly with how many square feet of siding you’ll need, but on average, a 2,000-square-foot home will need 1,700 square feet of siding or 17 squares of siding. Your siding measurements will vary depending on the layout of your home, the number of stories, the size of your doors and windows, and even your roof style.

Though vinyl siding is affordable, the material may not last as long or look as good as other siding materials. For example, wood siding has a beautiful, natural appearance but requires much more maintenance to keep your siding looking as good as new. 

Fiber cement siding is another alternative that mimics the appearance of wood siding. Like vinyl siding, fiber cement is a low-maintenance material, but it does come at a higher price and is heavier and more difficult to install. Weigh the pros and cons of all siding materials before you decide on the best option for your home.

No matter what types of metal siding you are cleaning, you should be able to clean them using the same processes you use for aluminum siding. Steel siding and aluminum siding both need cleaning about once per year. You can clean metal siding or aluminum siding without a pressure washer or with one.

Increasing home value and return on investment (ROI) are two different things and it’s important to differentiate between the two. While a kitchen remodel will surely raise the value of the house, it may only have an ROI of around 50%. Homeowners looking to raise the value of their home for sale will have to consider how much they will recoup by the monetary investment in projects, as the ROI percentages may be lower or higher than the added value on a dollar-for-dollar basis.

The Homer, PA homeowners’ guide to siding services

From average costs to expert advice, get all the answers you need to get your job done.