Top-rated siding pros.

Get matched with top siding pros in Homer, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your siding service project in Homer, PA?

Select your specific project to find the pro for you.

Find Siding pros in Homer

Avatar for Eco Builder Services Co
Eco Builder Services Co
3.9(
46
)
Metal Siding: Install or Completely ReplaceMetal Siding: Repair or Partially ReplaceSiding Installation or Repair+4 more

Serving Homer, PA and surrounding areas

In business since 2006

Free estimates

Emergency services offered

"
  • Met with Gino early June. Original contact with him (he called) was 3 hours after my email on a Sunday! Met with him several times going over what we wanted, gave him architectural drawings of the deck and discussed materials to be used. We had some concerns over attaching such a large structure to the house and wanted to be sure we would have no problems with it shifting or collapsing and to make sure the weight bearing was addressed with all posts etc. He was great to deal with, able to reach easily and quick to sign the contracts and pick up the deposit. I called 3 references, all glowing. All stated Gino's men worked from 7:00am to 7:00pm and finished the jobs in the assigned time and quality of work was excellent. 2 were repeat customers and some even referred him to their friends and actually he was on those additional jobs then. Sounded GREAT!
  • Contracts signed 6-22-12
Promised start date 7-16-12 and quoted a 10-14 day job. The only item not included in our original plans was the railing. We changed our minds and added the railing to the bid on 7-17-12 and paid for supplies and labor for this addition in full. Not once did Gino mention this may cause an extension on the original 10-14 day job time.
Promised start date delayed a week to 7-23-12. No one showed up. We had to call him to see what was going on! He then promised they would be there on 7-25-12, no one showed. FINALLY they showed up on 7-28-12. He offered NO explanation at that time.  
His employees would not show up for days with no explanation. Weather was cooperative. I found the prIncipal problem to be inexperienced employees with little to no supervision, they seem unsure as to what to do. Some errors in work were so obvious I noticed them! All issues we pointed out were corrected promptly.   
Here is a timeline of the work done using my dated photographs as a reference so as to be fair and accurate: 
July 28th-siding removed (3/4 of the back of my home is exposed to the elements). Holes being dug for sonna tubes. (note-they did have to dig in bedrock and actually needed jackhammers for a few of them).
August 3rd-sonna tubes in. 3 long beams in for the base of the deck (extending to the back from the house).
August 7th-framing has been done for the second time. First time they had such a bow in it that a foreman ripped it out and redid it in a day! 
August 13th-started roof beam frame. 
August 15th-roof frame complete.
August 20th-shingles on the roof complete-more siding removed.
August 22-face of the roof completed. (triangle part now solid)
August 25th-face of the roof now has scalloped siding 
August 28th-inside of roof framed for soffit.
August 30th-2 of the 3 columns up, 14 X 22 section of decking almost complete.
August 31st-all decking down, 3 columns done- still no siding on my house. We have been having major water damage to the interior of our home due to heavy rainfall and no siding. Spoke with GIno about our concerns but still no finish date set.
September 7th-railing 3/4 done, still missing siding and steps. 
September 13th railing complete, still needs soffit work and gutters. Siding now beginning to be being replaced but it has been almost 2 months without siding!
September 21st-soffit work completed. Siding is on and has been cleaned with a pressure washer.  Finally able to place my recently purchased furniture (June) onto my deck. Still needs lattice work completed but at least now I can sit on my deck (in a jacket!) Just in time to put the furniture away for the winter!
October 3rd-lattice work complete. Deck finally finished.
 To sum up my experience with Gino and ECO Builder Services:
 The end result was a beautiful deck. He always returned our calls even when he knew we were upset or angry. 
  
What I did not like
The time promised for the job (10-14 days) did not equal the time it took to finish the job! (82 total days/60 work days if you count Monday to Friday).
 When I addressed this with Gino I was met with rude comments, him hiding behind 2 separate contracts of 10-14 days , plus the add on contract (for items he neglected to include in the original bid!) 5-7 days and stating the times listed for each job were consecutive.  While I understand weather may play a part in missing some days here and there, I can assure you that the weather was the least of it. Lack of appropriate workers on site was always the problem.
 
I did not appreciate being bumped for more "important" clients and being the subject of his poor time management skills. Spending $19,000 on a deck and not being able to use it for an entire year is not what I had in mind back in mid JUNE.


"
Recommended by64%of homeowners
Avatar for DC Exterior LLC
DC Exterior LLC
5.0(
2
)
Wood or Fiber-Cement Siding - Install or Completely ReplaceWood or Fiber-Cement Siding - Repair or Partially Replace

Serving Homer, PA and surrounding areas

In business since 2020

Free estimates

Offers commercial services

"Very good company,new what l needed to fix my Hardie siding and did a great job They told me when they could get there and they were 1 day late but they called me and told me that they where running behind but they were there the next morning"
New construction Hotel
Dunkin repair
Dunkin repair
Response time10 mins
Recommended by100%of homeowners
Daryls Home improvement
5.0(
2
)
Metal Siding: Install or Completely ReplaceMetal Siding: Repair or Partially ReplaceSiding Installation or Repair+4 more

Serving Homer, PA and surrounding areas

In business since 1990

Free estimates

Emergency services offered

"Still in progress.  Happy thus far with completion pending.  Personable and trustworthy.  We have used him for a closet remodel earlier and have seen his work in friends condos.  Have had no issues with quality to date."
Recommended by100%of homeowners
Howard's Home Improvement
5.0(
2
)
Metal Siding: Repair or Partially ReplaceVinyl Siding - Install or Completely ReplaceVinyl Siding - Repair or Partially Replace+1 more

Serving Homer, PA and surrounding areas

In business since 1989

Free estimates

Warranties offered

"The owner went out of his way to meet me on a Saturday. The work is being done on my mother's home and he has made my mother feel very comfortable. He was very professional and understanding of our needs. He has just started some of the work on the house and will be working there after Christmas."
Recommended by100%of homeowners
Showing 1-10 of 17
Siding questions, answered by experts

Fiber cement siding is one of the lowest-maintenance options. The material’s formula is resistant to insect activities, moisture, and most physical impacts. Vinyl and aluminium siding is also fairly easy to upkeep. All these low-maintenance options only require basic surface cleaning, caulking, and regular gutter maintenance to prevent water dams from forming. 

If you buy new cedar, the process of cutting it usually roughs up the surface enough that it doesn’t require sanding. However, if you buy older cedar or you’re repurposing it from another application, it’s a good idea to sand it. This helps the stain settle into the grain, and results in a more uniform appearance.

As stunning and natural as stone siding is, it's not for everyone. Some popular siding alternatives to stone siding include:

  • Aluminum siding

  • Brick veneer siding

  • Engineered wood siding

  • Fiber cement siding

  • Wood siding

  • Vinyl siding

If you want the look of natural stone siding without the high material and installation costs, vinyl siding may be one of the best alternatives. It’s lightweight, low-cost, and low maintenance but does have a lower life span than natural stone.

You can put new siding over clapboards, but it’s not recommended. Some sidings, like vinyl siding, can go over clapboards with sheathing like a foam layer in between. However, it’s best to remove clapboard siding if you plan on replacing it with new siding. Burying wood clapboards underneath new siding can create risks of rot and mold, or hidden insect damage. It can also create warping issues over time. Removing clapboards allows you to properly install a new sheathing, as well as clean up the exterior wall and look for any signs of damage.

If you have stucco on the outside of your home, it’s technically considered cladding and not siding, but beyond that, it’s impossible to tell without a little digging. Without damaging the siding material, expose part of it to see if there’s an air gap between the siding and your exterior wall. If there is, you have cladding. If the siding is affixed directly to the exterior wall, you have a simple siding system.

The Homer, PA homeowners’ guide to siding services

From average costs to expert advice, get all the answers you need to get your job done.