Top-rated solar panel pros.

Get matched with top solar panel pros in Hazleton, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in Hazleton, PA?

Select your specific project to find the pro for you.

Find Solar panel pros in Hazleton

Avatar for Renewable Engineered Systems
Renewable Engineered Systems
4.7(
12
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+1 more

Serving Hazleton, PA and surrounding areas

In business since 1998

Free estimates

Emergency services offered

"Well we were going to do a ground mount using re-purposed
metal, but there was not enough of it. So Renewable Engineered Systems designed
a system for the roof of the house. We Worked with Brian Brown who helped us
decide what to use.   The solar panel
system is very neat. Get to watch my power everyday.

"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+14

Recommended by100%of homeowners
Avatar for Orbit Water Solutions
Orbit Water Solutions
4.8(
44
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+5 more

Serving Hazleton, PA and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"It was great we had an emergency situation everyone I spoke with in the office was supportive and informative we called at 9 AM in the morning and a technician was out at 2 PM the same day the installation went smoothly we could not have been happier cannot recommend this company enough fantastic !"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+9

Recommended by97%of homeowners
Showing 1-10 of 44
Solar Panels questions, answered by experts

Ideally, you want to place them facing true south. This is different from what a compass shows, which is called the magnetic south. You can find true south by using an online calculator as long as you know the longitude and latitude of your property. Solar panel placement is key to maximizing the energy you generate, so this is an important step.

The actual time it takes to construct the solar farm is relatively short, taking between 2 and 4 months on average. That timeline is dependent on site conditions, crew size, and the overall size of the solar farm.

However, the time it takes to get the ball rolling is significantly longer, ranging from 3 to 5 years. With a project of this scale, you’ll need to obtain all of the proper permits and approvals to start breaking ground, and depending on your location, that could be an extended process.

Yes, you should tell your home insurance company about your solar panels. Even if you believe they’re covered by your existing policy, installing a solar panel system is a significant change to your home. This can affect coverage and premiums. By discussing your new solar panel installation with your insurance provider, you can be sure you have enough coverage and that the policy completely covers the panels against damage.

You shouldn’t hook up a solar panel directly to a battery. That can damage the solar battery and your appliances over time. Instead, install a charge controller between your solar panel and solar battery. Charge controllers regulate voltage, prevent overcharging, and minimize the amount of electrical current to protect your battery from voltage spikes.

The best solar panels to withstand hail are those rated UL 61730. These solar panels are certified to withstand hailstones up to 3 inches in diameter and travel at speeds up to 88 mph. IP68 solar panels are the next most resilient solar panel. Solar panels without these ratings can handle hail up to 1 inch in diameter that travels up to 50 miles per hour. If you live in an area with frequent or severe hailstorms, purchasing UL 61730 solar panels is often worth the investment.

The Hazleton, PA homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.