Top-rated ceramic tile pros.

Get matched with top ceramic tile pros in Dilliner, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your ceramic tile service project in Dilliner, PA?

Select your specific project to find the pro for you.

Find Ceramic tile pros in Dilliner

Avatar for Rance Restoration
Rance Restoration
5.0(
5
)
Tile: Ceramic and Porcelain - Install

Serving Dilliner, PA and surrounding areas

Approved

Free estimates

Small jobs welcome

"He was very professional, on time and reasonable rates. He put several pieces of furniture together for me. He sure knows how to put furniture together. I would hire him over and over again."
21 neighbors recently requested a quote
Avatar for Gregus Renovation & Handyman Services
Gregus Renovation & Handyman Services
5.0(
2
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Ceramic and Porcelain - Repair+1 more

Serving Dilliner, PA and surrounding areas

Approved

In business since 2020

Free estimates

Small jobs welcome

"Matt installed the ceramic backsplash in our kitchen. His work is very professional and he did an excellent job. The backsplash looks exactly as I had hoped it would and I am very happy with Matt’s work. When I need ceramic tile work done in the future, I’ll be sure to call Matt."
flip house
master bath
kitchen
kitchen
flower bed

+95

Response time4 hrs
Response rate96%
2 neighbors recently requested a quote
Avatar for Empire Today - Pittsburgh
Empire Today - Pittsburgh
3.1(
114
)
Tile: Ceramic and Porcelain - Install

Serving Dilliner, PA and surrounding areas

Approved (Corporate)

In business since 1959

Free estimates

Warranties offered

"Have used them several times for carpet installation and tile flooring. Always a good experience. Great products and looks great. Very professional sales people and installers who are quite efficient."
Carpet
Engineered Hardwood
Laminate
Luxury Vinyl
Solid Hardwood

+6

219 neighbors recently requested a quote
Recommended by63%of homeowners
Avatar for Cimino Contracting
Cimino Contracting
5.0(
9
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Repair

Serving Dilliner, PA and surrounding areas

Approved

In business since 2005

Free estimates

Emergency services offered

"Bob got on the job right away and is very professional. Was done when he said it would be. This is the second time I needed his services and I couldn't be more satisfied. I recommend him to anyone who needs quality work."
Chimney teardown
Chimney teardown
Chimney teardown
Chimney teardown
Chimney teardown

+96

Response time1 day
Recommended by85%of homeowners
Showing 1-10 of 41
Ceramic Tile questions, answered by experts

Tile floor installation usually takes about 16 hours of active work along with a couple of days of drying time between tile and grout applications.

The amount of time it takes your installer will depend on many factors, including the square footage of the space, the tile material type, and if they need to make intricate tile cuts.

The reasons not to install flooring underneath a bathtub outweigh the benefits. A properly installed bathtub will keep water from reaching the unprotected subfloor underneath. Installing a tub on top of finished flooring can lead to damage and scratches to the new floor. Also, a small leak from a tub drain may be more difficult to notice if finished flooring impedes water drips.

Yes, your shower pan goes underneath your tiling and helps prevent excess water from seeping into the floor. Without the shower pan under your tile, water will seep through the grout and into the flooring. This will eventually lead to mold growth and serious water damage that could cost thousands of dollars to fix.

The underlayment determines a ceramic tile’s sturdiness, and a cement board or backer board works best. Be sure to tape the joints when using these materials, and consider laying it on top of a layer of thin-set for more stability.

The process takes two to four days, depending on the size of the area and your experience level. The first day involves assessing and prepping the existing tile, while the second day is for laying the new tile. This may take longer in complex areas. After letting the adhesive dry for 24 hours, grouting and sealing can be completed on day three. For larger projects or intricate tile patterns, expect the timeline to stretch a bit longer. Also, proper drying time between steps is essential for long-lasting results, which extends the project’s time.

The Dilliner, PA homeowners’ guide to ceramic tile services

From average costs to expert advice, get all the answers you need to get your job done.