Top-rated flooring contractors.

Get matched with top flooring contractors in Big Run, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your flooring project in Big Run, PA?

Select your specific project to find the pro for you.

Find Flooring contractors in Big Run

Avatar for Wyland property services
Wyland property services
4.3(
6
)
Laminate Wood or Stone Flooring - InstallLaminate Wood or Stone Flooring - RepairLuxury Vinyl Flooring - Install - Materials Not Provided by Consumer+1 more

Serving Big Run, PA and surrounding areas

Approved

In business since 2024

Free estimates

Credit card accepted

"We live in an older house and our floor was a nightmare. We had luxury vinyl flooring installed in the entire downstairs, the stairway platform, and our upstairs hallway. It looks amazing. He did such a great job. We hired him a second time to come back and install new flooring in the upstairs bedrooms and to replace five interior doors in our home after Christmas."
Response time6 hrs
Response rate100%
Service Man Shawn
4.9(
5
)
Wood Flooring - Repair or Partially ReplaceLaminate Wood or Stone Flooring - InstallLuxury Vinyl Flooring - Install - Materials Not Provided by Consumer+1 more

Serving Big Run, PA and surrounding areas

Approved

In business since 2001

Small jobs welcome

Customers say: Quick response

"I am a contractor and I am happy that I did not have to do this job, I was very happy with it. Shawn is clean and respectable plus he offered me a great deal on the project!"
Response time9 hrs
Response rate100%
10 neighbors recently requested a quote
Avatar for Keystone Remodeling & Restoration
Keystone Remodeling & Restoration
4.1(
14
)
Vinyl or Linoleum Sheet Flooring or Tiles - InstallLaminate Wood or Stone Flooring - InstallLaminate Wood or Stone Flooring - Install - For Business+7 more

Serving Big Run, PA and surrounding areas

Approved

In business since 2018

Free estimates

Small jobs welcome

"Contract Agreement Date: June 20, 2025 Parties: Keystone Remodeling and Restoration Services, DuBois, PA (Phone: 814-849-8490) and William & Shawn Johnston Scope of Work: Keystone Remodeling and Restoration Services (“Contractor”) agrees to: 1. Remove existing carpeting and install new flooring in approximately 1,700 sq. ft. of space. o Customer will supply the flooring materials. o Determination of whether transitions are needed will be made after floor removal. 2. Repair kitchen lighting at a cost of $50.00 per man needed. 3. Install a customer-purchased shower at no additional labor cost. Labor & Materials: • Labor will be billed at $75.00 per man-hour. • If Contractor supplies any materials, a 15% markup will be applied to the cost of those materials. • Drive time is charged one way starting at 8:00 AM daily. Estimated Duration: • Flooring installation is estimated to take approximately one week. Start Date: • Work is scheduled to begin July 21, 2025. Payment: • On June 20, 2025, William & Shawn Johnston paid Keystone Remodeling and Restoration Services a $1,500 down payment toward the project. • Project Update – July 7, 2025 • On July 7, 2025, Keystone Remodeling and Restoration Services traveled to Lowe’s to pick up the flooring materials for the project. Due to the flooring not fitting on the Contractor’s small trailer, William & Shawn Johnston arranged for a U-Haul truck to transport the materials to the residence. • Upon delivery, the crew from Keystone Remodeling and Restoration unloaded the flooring and placed it in the living room. Additionally, the Contractor assisted in removing items from the home and loading them into the U-Haul for the Customer. Project Update – July 21, 2025 On July 21, 2025, at 8:00 AM, Keystone Remodeling and Restoration Services entered the home of William & Shawn Johnston to begin scheduled work. The crew removed carpeting throughout the home, completed all flooring installation, removed the old bathtub, and installed a new shower surround. On July 25, 2025, Keystone Remodeling and Restoration Services returned to the home of William & Shawn Johnston to complete the remaining scope of work • Remaining Balance Due: $1,542.82 • Payment made via Check #640: $1,542.82 Final Statement: William & Shawn Johnston were informed by Keystone Remodeling and Restoration Services that this payment represents the balance due for all work completed as of July 25, 2025. Project Update – July 28, 2025 On July 28, 2025, Shawn Johnston received a phone call from Keystone Remodeling and Restoration Services. The Contractor stated that they had miscalculated the final total for the project and claimed a remaining balance due of $800.00. Payment was declined to make any further payment, stating that any miscalculation was the Contractor’s responsibility. It was also noted that the shower was not functional, as the material placed on the pipes had solidified, preventing proper use. Project Update – August 4–12, 2025 • 08/04/2025 – After using the shower, a leak was discovered. Shawn Johnston contacted Keystone Remodeling and Restoration Services to report the issue. • 08/05/2025 – Keystone Remodeling and Restoration visited the property to repair the leak. The crew instructed that the shower not be used for 36 hours. • 08/09/2025 – Upon resuming use of the shower, the leak reoccurred. • 08/11/2025 – Shawn Johnston called Keystone Remodeling and Restoration to report the leak. The call was not returned; however, a voicemail message was left. • 08/12/2025 – Shawn Johnston again called Keystone Remodeling and Restoration to report the continued leak. No response was received. Following the lack of response, Shawn contacted Angi List to report the problem and was informed of the process for filing a formal complaint against the Contractor. Complaint Summary: • Keystone Remodeling and Restoration was paid for work that included installation of a fully functional shower. • The shower continues to leak and is not functional. • The Contractor has allegedly refused to complete necessary repairs unless an additional $800.00—an amount disputed by the Customer—is paid. • The Customer believes this constitutes an attempt to collect funds not owed and is effectively being “held hostage” for payment. • The Contractor has not provided requested billing documentation from Lowe’s for materials purchased. Despite being paid a total of $11,262.82—well above the initially discussed project cost of approximately $8,000—the Contractor has: 1. Failed to deliver a fully functional shower, which continues to leak despite multiple repair attempts. 2. Refused to address the ongoing leak unless an additional, disputed $800.00 is paid. 3. Not provided requested receipts or proof of material purchases from Lowe’s. 4. Confirmed on July 25, 2025, that the account was paid in full, then later attempted to alter the final balance. ________________________________________"
Bathroom Remodel
Bathroom Remodel
Bathroom Remodel
Bathroom Remodel
Kitchen Remodel

+10

Response time2 days
Response rate100%
122 neighbors recently requested a quote
Pitbull Construction
New to Angi
Laminate Wood or Stone Flooring - Install - For Business

Serving Big Run, PA and surrounding areas

Approved

In business since 2015

Free estimates

Small jobs welcome

We take great pride our experience, expertise, quality, and customer service that we provide to meet the consumer need. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

Response time20 mins
Ascended Constructions
New to Angi
Laminate Wood or Stone Flooring - InstallLuxury Vinyl Flooring - Install - Materials Not Provided by ConsumerLuxury Vinyl Flooring - Install - Materials Provided by Consumer+1 more

Serving Big Run, PA and surrounding areas

Approved (Corporate)

In business since 2023

Offers commercial services

We’re a family owned and operated company that values honesty and integrity, and stands behind our work. We offer over 40 years of industry experience. We specialize in Asphalt Shingle Roofing installation, replacement, and repairs. Our services are customized to the individual project, paying close attention to the details of each project that we're involved with. We look forward to building long-term relationships with our clients and guarantee your satisfaction!

1 neighbors recently requested a quote
Avatar for John's Custom Flooring
John's Custom Flooring
5.0(
25
)
Flooring - Install, Repair, or RefinishLaminate Wood or Stone Flooring - InstallLaminate Wood or Stone Flooring - Install - For Business+15 more

Serving Big Run, PA and surrounding areas

In business since 2001

Free estimates

"John did a great job installing new vinyl flooring throughout my entire 1st floor. He did not give me the run around like other contractors do. He arrived early every day to get the job done quickly. He also left the jobsite clean before he left. Overall, highly recommend if you need some flooring installed."
Sand and finish
Sand and finish
Sand and finish
Sand and finish
Sand and finish

+54

Recommended by95%of homeowners
...
Showing 1-10 of 58
Flooring Installation questions, answered by experts

Each flooring material has its own maintenance requirements and cleaning techniques. For example, hardwood floors may require occasional refinishing and specialized cleaning products, while vinyl and laminate are easy to clean with regular sweeping and mopping. Concrete and natural stone, on the other hand, may need periodic sealing to maintain their appearance and durability. Follow manufacturer recommendations and utilize appropriate cleaning methods to preserve the integrity of your chosen flooring material.

If the stairs are already covered in carpet, you will need to remove the old carpet and possibly the carpet pad. Any damage to the stairs like cracks, loose boards, or creaky treads may also need to be repaired. You may also want to sand and refinish or paint wood stairs before installing a carpet runner.

Because concrete is porous, installing flooring directly onto the surface is not a good idea. Any moisture within the concrete due to atmospheric conditions or seasonal humidity can seep into your flooring, causing warping or damage. In most cases, you’ll need to install at least a moisture barrier between the concrete and the flooring you choose.

Yes, installing underlayment underneath the laminate flooring is necessary. The underlayment has many benefits like preventing water damage to your subfloors, insulating the floor for sound, and providing an even surface for the planks to sit on.

When you skip the underlayment, you can end up with serious issues, including water damage to your subfloors, noisy planks, and an uneven floor.

No, squeaky floors do not always mean there is structural damage. The noise is often caused by friction from issues like loose floorboards, gaps between the subfloor and joists, or loose subflooring. While many squeaks are harmless, persistent or worsening noise could indicate a more severe problem. If you notice other signs of structural damage—such as soft or sagging floors, cracks running from the wall to the ceiling, or horizontal cracks in your foundation—it's best to have a professional inspect your floor to determine the root cause.

The Big Run, PA homeowners’ guide to flooring services

From average costs to expert advice, get all the answers you need to get your job done.