Solar Panels questions, answered by experts

The best solar-panel mounting system will depend on your property layout, but you’ll typically want to try for south-facing panels to get the most sun. Roof mounting and wall mounting are both popular, but if your well setup is far away from buildings and other structures you can also set up a freestanding aluminum frame to mount your panels.

  • Installing a new electrical meter box

  • Replacing your meter base

  • Replacing your service entrance cable 

The cost to install or upgrade an electrical meter box ranges from $100 to $650, including $50 to $250 for the unit. The meter base passes the power from your electric company to your panel. The cost to replace a meter base is roughly $50 to $250. 

Service entrance cables are electrical cables with multiple wires, bringing power from electrical companies to residential buildings. The cost to replace a service entrance cable ranges roughly from $1,000 to $1,500.

Yes, you should tell your home insurance company about your solar panels. Even if you believe they’re covered by your existing policy, installing a solar panel system is a significant change to your home. This can affect coverage and premiums. By discussing your new solar panel installation with your insurance provider, you can be sure you have enough coverage and that the policy completely covers the panels against damage.

Depending on the climate in your area, the best time to install solar panels is either winter or early spring. Summer is a fine time to install panels, too, but it tends to be the busy season, so prices may be higher and companies may have packed schedules. The installation process can take more time than expected between getting permits and finalizing a design, so start as soon as you can.

The actual time it takes to construct the solar farm is relatively short, taking between 2 and 4 months on average. That timeline is dependent on site conditions, crew size, and the overall size of the solar farm.

However, the time it takes to get the ball rolling is significantly longer, ranging from 3 to 5 years. With a project of this scale, you’ll need to obtain all of the proper permits and approvals to start breaking ground, and depending on your location, that could be an extended process.