Top-rated basement remodelers.

Get matched with top basement remodelers in Irrigon, OR

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Irrigon, OR?

Select your specific project to find the pro for you.

Find Basement remodelers in Irrigon

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Irrigon, OR and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Precision Tile
Precision Tile
4.0(
4
)
Basement - Remodel

Serving Irrigon, OR and surrounding areas

Emergency services offered

"Edgar and his crew did a fantastic job of remodeling our 69 year old bathroom! Communication was great and the job was completed in the time frame he stated. The upgrade from a cast iron bathtub to a tile walk in shower is amazing! Don't hesitate, hire Precision Tile and Home Remodel to do your remodel today!!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+93

Recommended by100%of homeowners
Avatar for Monarch Build Co. LLC.
Monarch Build Co. LLC.
5.0(
1
)
Basement - Remodel

Serving Irrigon, OR and surrounding areas

In business since 2020

Free estimates

Emergency services offered

We pride our company on reliability, great communication, integrity, and quality work. We are experts in our trade and will do our best to keep you as educated as we can on your particular task or project. We look forward to earning your business!

Response time4 hrs
Response rate100%
Showing 1-10 of 18
Basement Remodel questions, answered by experts

Common mistakes when finishing basement walls include neglecting proper insulation, insufficient moisture management, and poor ventilation. Not addressing these issues can lead to mold growth, water damage, and discomfort. Additionally, inadequate planning, improper framing, and rushing the project can result in subpar outcomes. 

It's essential to follow best practices, seek professional guidance if needed, and prioritize thoroughness and attention to detail.

Yes. Renovating your basement has a return on investment (ROI) of 75%, meaning your remodel investment will significantly increase the value of your home. Besides the ROI, your family can enjoy a larger, more usable space while you live there. 

Renovation enhances functionality, increases home value, and can add new space for personal or family needs. It typically modernizes older unfinished basements for new uses.

Basements with persistent moisture problems or flooding shouldn’t be finished until the moisture issues have been fixed. In addition, if your foundation is cracked, you have unmitigated radon levels, or you have asbestos or lead pipes, remediate the underlying problem before finishing your basement. Turning a basement into living space before fixing these issues can lead to serious health risks or structural damage. 

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Irrigon, OR homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.