Top-rated basement remodelers.

Get matched with top basement remodelers in Athena, OR

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Athena, OR?

Select your specific project to find the pro for you.

Find Basement remodelers in Athena

Avatar for Precision Tile
Precision Tile
4.0(
4
)
Basement - Remodel

Serving Athena, OR and surrounding areas

Emergency services offered

"Edgar and his crew did a fantastic job of remodeling our 69 year old bathroom! Communication was great and the job was completed in the time frame he stated. The upgrade from a cast iron bathtub to a tile walk in shower is amazing! Don't hesitate, hire Precision Tile and Home Remodel to do your remodel today!!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+93

Recommended by100%of homeowners
Eagle Cap Construction, LLC
4.3(
3
)
Basement - Remodel

Serving Athena, OR and surrounding areas

In business since 1990

Free estimates

Credit card accepted

We have over 25 years of experience in the business. Here at Eagle Cap Construction LLC we pride our company on reliability, great communication, integrity, and quality work. We are experts in our trade, and will do our best to keep you as educated as we can, on your particular task or project. We look forward to earning your business! Call Matt today for prompt and professional service, or book directly online!

Response time2 days
Recommended by100%of homeowners
Showing 1-10 of 19
Basement Remodel questions, answered by experts

In many homes, an unfinished basement is an ideal place for an in-ground pool. The concrete floors, protection against water damage, and access to the ground below your home make this a large contender. Speak with a local basement remodeling contractor to ensure your space is right for the large construction.

Yes, in most cases, finishing a basement is worth the cost. The project adds valuable, usable square footage to your home and typically provides a return on investment (ROI) of 70% to 75%. For example, an average basement refinishing project costing $32,000 could add between $22,400 and $24,000 to your property's value. The final value added depends on factors like your location, the quality of materials and workmanship, and the features you include, such as a living space, bedroom, or bathroom. To be officially counted in your home's total square footage, the finished space must comply with all local building codes, including requirements for points of egress. However, in areas prone to flooding, a finished basement might be seen as a liability by potential buyers and could potentially decrease your home's value.

A finished basement must have a heat and electrical supply with an entrance that meets building code requirements, such as a stairwell to the home's main living space. It often must include finished walls, ceilings, and floors. If the finished basement includes a bedroom, it should have a heat source, an egress window, and a closet.

Remodeling, as opposed to finishing, means altering an already finished basement by adding a bathroom, bedroom, or living area.

Installing a bathroom in a basement isn’t a project for most homeowners. Many parts—plumbing, electricity, and carpentry—go into this project, each requiring expert-level knowledge and tools. One miscalculation can lead to very expensive repairs. Plus, some homeowner’s insurance might not pay for damages caused by a homeowner DIYing this project. You can protect yourself by allowing the pros to complete this job for you. 

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Athena, OR homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.