Top-rated basement remodelers.

Best basement remodelers near Pink, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Pink, OK?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Pink - Updated Nov 2026

Avatar for Ortiz Custom Remodeling LLC
Ortiz Custom Remodeling LLC
4.1(
10
)
Basement - Remodel

Serving Pink, OK and surrounding areas

Approved

In business since 2022

Free estimates

Credit card accepted

"Got the ceiling installed quick. Lools great! Came back and added extra texturing where it was needed after the job was already finished. They take pride in their work."
Kitchen cabinets
Kitchen Remodel
Kitchen Remodel
Countertop
Kitchen Remodel

+12

Response time8 hrs
2 neighbors recently requested a quote
Recommended by80%of homeowners
Avatar for 1935 Construction
1935 Construction
New to Angi
Basement - Remodel

Serving Pink, OK and surrounding areas

Approved

Free estimates

Emergency services offered

Small jobs welcome

Introducing 1935 Construction Group (1935 CG)\n\nAt 1935 Construction Group, we believe every great project starts with a vision and is brought to life through quality craftsmanship, dedication, and attention to detail.\n\nWe specialize in commercial and residential construction, renovations, remodeling, and property improvements, helping business owners, investors, and homeowners transform their spaces.\n\nFrom restaurant and bar build-outs to commercial renovations and residential improvements, our goal is to deliver reliable service, quality workmanship, and results that exceed expectations.\n\nWhether you’re launching a new business, renovating an existing property, or bringing a new development to life, 1935 CG is committed to building lasting relationships and delivering projects you can be proud of.\n\n1935 Construction Group\nBuilding Vision. Creating Value. Delivering Excellence.\n\nLet’s build something great together.

2 neighbors recently requested a quote
L and L Adventures
New to Angi
Basement - Remodel

Serving Pink, OK and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

Hi, my name is Tommy and I'm the owner and operator of l and L Adventures. A small company formed so I can meet the needs of individuals in need of a variety of jobs completed. My service extend from small home and farm repairs and services to remodels, custom drywall finishing and textures, landscaping and planning, painting and much much more. \nTogether we can find an innovative solution to meet your needs. God provides and if we love him and one another the same we will surely make him smile. Free estimates. Call me anytime to chat about what I can do for you.

Subfloor replacement
Subfloor replacement
Subfloor replacement
Subfloor replacement
Subfloor replacement

+15

...
Showing 1-10 of 66
Basement Remodel FAQs, answered by experts

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Unless you have extensive experience in construction work, remodeling a basement is best left to a professional. There are several tasks associated with this project that require exact precision, including:

  • Replacing insulation 

  • Replacing carpet or other flooring 

  • Adding heating and cooling

  • Adjusting or adding walls and doors

  • Altering or adding plumbing elements

If any of these elements is done incorrectly, it could severely impact the quality of your basement remodel and be dangerous. Changing a basement often comes with code safety requirements, like egress windows and proper ventilation. Therefore, leaving it up to a professional is often the best decision.

Walkout basements cost more than other kinds of basements, and can also increase your risk of leaks as well as a loss of insulation, leading to higher heating and cooling costs. Improperly installed walkout basements may lead to structural issues with your foundation, so ensure you’re working with a contractor who has extensive experience with this kind of basement.

Yes, most general contractors require an initial down payment, typically between 10% and 25% of the total project cost. This upfront payment helps cover the costs of materials, permits, and subcontractors. The remaining project costs are usually billed after specific project milestones are reached or on set completion dates, as outlined in your contract. Be wary of contractors who require a significant deposit of 50% or more upfront, as this could be a red flag for a scam.

If you have the woodworking experience to build a bar from scratch and you have the time, DIYing the work is a no-brainer and can save a few thousand dollars. However, if you’re looking to include a sink, additional lighting fixtures, or high-end bar tops and cabinets, it’s usually a better idea to call in a pro. It will cost more, but the finished product will likely be worth it.

The Pink, OK homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.