Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Kansas, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Kansas, OK?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Kansas

Avatar for A & S Coating
A & S Coating
4.6(
33
)
Asphalt Paving - Repair or PatchAsphalt Sealing

Serving Kansas, OK and surrounding areas

Approved

In business since 2003

Free estimates

Emergency services offered

"Great work and explained the process and repaired asphalt driveway and sealed it. Very happy with work done. The equipment used, looked brand new, even though he told me the equipment was 10 years old."
Main parkinglot
Golf cart path
Golf cart path
Golf cart path
Main parkinglot

+25

Response time8 hrs
Response rate97%
25 neighbors recently requested a quote
Avatar for ATX Asphalt Paving
ATX Asphalt Paving
4.4(
18
)
Asphalt Paving - InstallAsphalt Paving - Repair or PatchAsphalt Sealing+1 more

Serving Kansas, OK and surrounding areas

Approved

Free estimates

Emergency services offered

Credit card accepted

"I think Jerome and Ollie are great people. They are aware I was (and am) disappointed in the finished look of the driveway. My reason is because they put a much thinner layer of chip stone on the back part of the driveway vs the front. There are still spots so thin (lacking chip) that the tar is clearly visible. Plus, there is a noticeable drop-off at the front to back transition point on the circle which looks bad (less than professional) in my opinion. When I pointed out my concerns and asked them to remedy the matter, they declined to do so, However, on a positive note, the driveway, as is, seems to be holding up well since it was installed 2 years ago. It is serving its purpose, and we like it better than the former road base driveway. It just did not (and does not) look like a quality finished product. I believe ATX will do a good job for any client per the agreed contract. My recommendation to anyone planning to put in a chip-seal drive is to clearly specify everything, such as, desired driveway thickness, or the number of layers to be done, etc.. Also, be aware that grass & weeds will still grow through such a driveway, which is nature, and not the fault of the contractor. Be prepared to invest in lots of roundup and a good pump sprayer."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+21

6 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for Landers Contracting
Landers Contracting
4.1(
11
)
Concrete Driveways - Install

Serving Kansas, OK and surrounding areas

Approved

In business since 2015

Free estimates

Customers say: Quick response

"Mr. Lander and his crew were very professional and knowledgeable. I had wanted to change the original design and that wasn't a problem for them. They did the work and cleaned up afterwards. I am very pleased and will definitely hire them again ."
Finished product
finished product
finished product
prior to pad instillation
surface grate drain

+95

Response time3 days
2 neighbors recently requested a quote
Recommended by88%of homeowners
Avatar for 3G PAVEMENT SOLUTIONS LLC
3G PAVEMENT SOLUTIONS LLC
New to Angi
Asphalt Sealing

Serving Kansas, OK and surrounding areas

Approved

In business since 2014

Free estimates

Emergency services offered

We are 3G Pavement Solutions, a highly rated, woman-owned and operated business founded by a mother committed to building a future for her three daughters (3G). This personal drive ensures every project is executed with unwavering integrity.\n\nOur Mission: To protect your investment and ensure full compliance through comprehensive pavement maintenance.\n\nWhy Choose 3G?\nFull Solutions: We manage the entire asphalt lifecycle: paving repairs, professional sealcoating, and precision striping.\n✅ Compliance Experts: We eliminate liability by guaranteeing all ADA and Fire Lane markings meet federal and local codes.\n🏆 Laser-Straight Lines: Our striping is flawlessly straight, boosting curb appeal.\n🤝 Transparent Pricing: Fixed estimates with no surprises.\n💪 Durability: We use industrial-grade materials for long-lasting results.\nServices: Sealcoating, asphalt repair, striping, ADA marking, fire lane painting, and custom stenciling.\nClick "Request a Quote" for a free consultation!

Big Whiskey's
Front of Building
Custom Stencil
12 neighbors recently requested a quote
PERMALIFT FOUNDATION REPAIR LLC
4.3(
61
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Kansas, OK and surrounding areas

In business since 2002

Credit card accepted

"I recently bought a house and a few issues were pointed out by inspections. These guys were referred to me by friends and after getting a few bids, I had them fix my problems. They werent the cheapest, but they fixed my issues and that was all that really mattered to me.
"
Recommended by93%of homeowners
...
Showing 1-10 of 109
Asphalt Driveways questions, answered by experts

Concrete is typically the best material for a driveway if you’re looking for longevity, cost-effectiveness, and ease of maintenance. But, it’s not ideal for areas with annual freeze-frost cycles, nor is it the most attractive option—although you can get it stamped or painted. If your location is consistently below freezing, asphalt may be a better choice.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

Gravel is the cheapest way to extend a driveway. Gravel is an affordable, practical option that’s easy to install and perfect for DIY projects, helping you save on labor costs. It can be quickly spread and leveled to create extra driveway space without heavy preparation. While gravel doesn’t offer the same durability or finished look as concrete or asphalt, its low cost makes it ideal for budget-conscious homeowners who want a functional solution without overspending.

The Kansas, OK homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.