Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Pryor, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Pryor, OK?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Pryor

Avatar for A & S Coating
A & S Coating
4.6(
33
)

Serving Pryor, OK and surrounding areas

Approved

In business since 2003

Free estimates

Emergency services offered

"Alfred and Son did an excellent job resealing our very long driveway and repaired all of the deep cracks. We really like how the entire project turned out and would highly recommend them."
Main parkinglot
Golf cart path
Golf cart path
Golf cart path
Main parkinglot

+25

Response time9 hrs
Response rate96%
21 neighbors recently requested a quote
Avatar for Harmon Concrete
Harmon Concrete
5.0(
4
)

Serving Pryor, OK and surrounding areas

Approved

In business since 2023

Free estimates

Emergency services offered

"Harmonn Concrete did an excellent job! The crew was professional, on time, and paid great They did an excellent job! They paid attention to detail from start to finish. The work turned out great and exactly what I was hoping for. Great communication and a smooth process the whole way through—highly recommend!"
Response time2 days
Response rate100%
3 neighbors recently requested a quote
Avatar for BWC Construction Services
BWC Construction Services
4.4(
63
)

Serving Pryor, OK and surrounding areas

Approved

Super Service Award Winner

In business since 1994

Free estimates

Warranties offered

"The concrete finishers did a great job and provided concrete, all required tools, concrete buggy and labor. These guys are highly recommended."
Deck and handicap ramp
Deck and handicap ramp
Deck and handicap ramp
Deck and handicap ramp
Deck and handicap ramp

+24

Response time3 days
2 neighbors recently requested a quote
Recommended by58%of homeowners
Avatar for 3G PAVEMENT SOLUTIONS LLC
3G PAVEMENT SOLUTIONS LLC
New to Angi

Serving Pryor, OK and surrounding areas

Approved

In business since 2014

Free estimates

Emergency services offered

We are 3G Pavement Solutions, a highly rated, woman-owned and operated business founded by a mother committed to building a future for her three daughters (3G). This personal drive ensures every project is executed with unwavering integrity.\n\nOur Mission: To protect your investment and ensure full compliance through comprehensive pavement maintenance.\n\nWhy Choose 3G?\nFull Solutions: We manage the entire asphalt lifecycle: paving repairs, professional sealcoating, and precision striping.\n✅ Compliance Experts: We eliminate liability by guaranteeing all ADA and Fire Lane markings meet federal and local codes.\n🏆 Laser-Straight Lines: Our striping is flawlessly straight, boosting curb appeal.\n🤝 Transparent Pricing: Fixed estimates with no surprises.\n💪 Durability: We use industrial-grade materials for long-lasting results.\nServices: Sealcoating, asphalt repair, striping, ADA marking, fire lane painting, and custom stenciling.\nClick "Request a Quote" for a free consultation!

Big Whiskey's
Front of Building
Custom Stencil
9 neighbors recently requested a quote
...
Showing 1-10 of 142
Asphalt Driveways questions, answered by experts

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Regular cleaning, sealing, and timely repair of cracks help maintain its condition.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Pryor, OK homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.