Top-rated contractors.

Get matched with top contractors in Boley, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in Boley, OK?

Select your specific project to find the pro for you.

Find Contractors in Boley

Avatar for T & R Construction
T & R Construction
4.1(
40
)

Serving Boley, OK and surrounding areas

Approved

In business since 1986

Free estimates

Customers say: Terrific value

"Showed up and called several weeks later and we returned call but left message. Couple of weeks later got a verbal quote and requested email as we had requested a the time job was shown and requested. Several weeks have passed since then no email. I guess too busy to send written quotes and design."
New Homes
Room Additions
Pole Barns
Bathrooms
Tile Work

+2

Response time1 day
3 neighbors recently requested a quote
Recommended by81%of homeowners
Avatar for DLM Constructors LLC
DLM Constructors LLC
4.3(
6
)

Serving Boley, OK and surrounding areas

Approved

In business since 2022

Free estimates

Warranties offered

"DLM is dependable, professional, fair priced, knowledgeable and quality work. I have an ongoing build that I will need several different kinds of work done and I wouldn’t hire anyone else but DLM! Great people to work with and we look forward to working with Mike and his family in the future. ?"
Home Addition
Home Addition
Barndominium
Home Addition
Home Addition

+12

15 neighbors recently requested a quote
Recommended by80%of homeowners
Avatar for Air Roofing & Contracting LLC
Air Roofing & Contracting LLC
4.7(
220
)

Serving Boley, OK and surrounding areas

In business since 2006

Free estimates

Emergency services offered

"Had three contractors bid the job, chose AIR Roofing above the others. I was very satisfied with the quality of the materials used, the installation crews attention to detail, the price, responsiveness and overall quality of the job."
Additional Photos
Additional Photos
Additional Photos
Shingles installed on this project are Class 4 impact resistant shingles. This shingles typically will save the average homeowner 15% to as much as 50% off there homeowners insurance.
Shingles installed on this project are 25yr shingles commonly referred to as 3-tab shingles

+5

Recommended by94%of homeowners
Avatar for Roca Roofing & Construction
Roca Roofing & Construction
4.2(
83
)

Serving Boley, OK and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"Did not start when expected due to weather and prior jobs, but contractor and help did come and work.  Painting touch ups after work completed took longest.  But the sub contractor did excellent job.  When I found detail not to my liking, Roca was quick to send foreman out and fix to my satisfaction.  I liked that they tried to hire and use Veterans.  When chimney liked, they again sent person out quickly and he fixed the problem even though it was not part of the original work.  I thought they were fair and good."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Recommended by87%of homeowners
...
Showing 1-10 of 56
Unfinished Carpentry questions, answered by experts

When building a house, it is customary to use 16d nails that measure 3 1/2 inches in length to construct the frame. These nails are crucial in providing the necessary support and stability for structural elements like joists and studs, which ensures a sturdy framework.

Framing most homes takes anywhere between five and eight weeks to complete. You’ll need to account for inclement weather conditions, material shipment times, the number of crew members, and the weight of your materials. If the weather is too hot, wet, or cold for the installation, this process could take closer to eight weeks.

Yes, professional installations include reinforced corner posts to ensure durability.

Installing an ornamental or decorative porch column takes around three to five hours. Structural columns take longer because your pro has to install a jack to hold up the roof while switching the column out. If there's any structural damage, it can add several days to the timeline to repair the damage.

Yes, you will need a jack for a rim joist replacement. To prevent sagging and facilitate the removal of load-bearing wood, you’ll need to relieve the pressure from this joint before beginning work. 

Due to hydraulics and other specialized equipment, a sill plate and rim joist replacement are not typically a DIY project. Hiring a professional structural engineer and experienced contractors is the best approach to replacing rotted sill plates and rim joists.

The Boley, OK homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.