Top-rated basement remodelers.

Get matched with top basement remodelers in Weston, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Weston, OH?

Select your specific project to find the pro for you.

Find Basement remodelers in Weston

Avatar for CSG Specialty Fabrication
CSG Specialty Fabrication
5.0(
22
)
Basement - Remodel

Serving Weston, OH and surrounding areas

Approved

In business since 1997

Free estimates

Credit card accepted

"They came to work when they said they were and stayed until the job was finished. They were pleasant, courteous, professional and cleaned up all leftover debris. I am so pleased with my finished product."
Front Porch
Front Porch
Pergola Remodel
Pergola Remodel
Pergola Remodel

+47

Response time1 day
Recommended by100%of homeowners
McVicker International
4.0(
4
)
Basement - Remodel

Serving Weston, OH and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

"I hired Mcvicker International too help repair a few cosmetic and structural damages in my dry wall before giving it a fresh coat of paint. In my foyer, main Hallway, Living Room and Dining Room with some touch ups above my tile surround in my kitchen. Ive attempted to attach photos but the site seems to reject them? However it was superb quality regardless."
26 neighbors recently requested a quote
Avatar for Gorney Builders
Gorney Builders
0.5(
1
)
Basement - Remodel

Serving Weston, OH and surrounding areas

Approved

In business since 2000

Free estimates

Warranties offered

We are a locally owned and operated company that values honesty and integrity, and treats your home as if it were our own. We offer a variety of services that are customization to each individual project. You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships, and guarantee your satisfaction!\n

Roof Replacement
Roof Replacement
Roof Replacement
Roof Replacement
Roof Replacement

+48

Response time8 hrs
Response rate100%
2 neighbors recently requested a quote
G L Construction Management
4.7(
3
)
Basement - Remodel

Serving Weston, OH and surrounding areas

In business since 2016

Free estimates

Emergency services offered

"G L Construction Management was such a great company to work with! I had numerous services completed by them in many rooms of my home. Very professional and friendly company. I wanted several things done before I moved into my new home and they worked very quickly to get me and my child settled in before Chrismas. I would recommend them for any household construction needs."
Garage / Shed Build Project
Kitchen and Bath Remodeling Project
Kitchen and Bath Remodeling Project
Kitchen and Bath Remodeling Project
Kitchen and Bath Remodeling Project

+23

Recommended by100%of homeowners
...
Showing 1-10 of 67
Basement Remodel questions, answered by experts

Lifting a house and adding a basement is one way to add usable square footage. Lifting or jacking a house is a complex process, and it can be expensive, not to mention that you won’t be able to live in your house while it’s lifted, due to safety concerns. Lifting a house should only be done by experienced professionals.

Basements with persistent moisture problems or flooding shouldn’t be finished until the moisture issues have been fixed. In addition, if your foundation is cracked, you have unmitigated radon levels, or you have asbestos or lead pipes, remediate the underlying problem before finishing your basement. Turning a basement into living space before fixing these issues can lead to serious health risks or structural damage. 

If you have the woodworking experience to build a bar from scratch and you have the time, DIYing the work is a no-brainer and can save a few thousand dollars. However, if you’re looking to include a sink, additional lighting fixtures, or high-end bar tops and cabinets, it’s usually a better idea to call in a pro. It will cost more, but the finished product will likely be worth it.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

A finished basement does not always count as square footage, as this varies by state regulations. In areas that allow below-grade spaces to be included in a home's official square footage, the basement must typically meet certain conditions. These conditions often include having a functional egress and being a livable space with flooring, finished walls, and temperature control. To be certain, contact your local assessor to confirm your area's specific policies regarding basement square footage.

The Weston, OH homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.