Top-rated basement remodelers.

Get matched with top basement remodelers in Weston, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Weston, OH?

Select your specific project to find the pro for you.

Find Basement remodelers in Weston

Avatar for CSG Specialty Fabrication
CSG Specialty Fabrication
5.0(
22
)
Basement - Remodel

Serving Weston, OH and surrounding areas

Approved

In business since 1997

Free estimates

Credit card accepted

"They came to work when they said they were and stayed until the job was finished. They were pleasant, courteous, professional and cleaned up all leftover debris. I am so pleased with my finished product."
Front Porch
Front Porch
Pergola Remodel
Pergola Remodel
Pergola Remodel

+47

Response time1 day
Recommended by100%of homeowners
Avatar for Gorney Builders
Gorney Builders
0.5(
1
)
Basement - Remodel

Serving Weston, OH and surrounding areas

Approved

In business since 2000

Free estimates

Warranties offered

We are a locally owned and operated company that values honesty and integrity, and treats your home as if it were our own. We offer a variety of services that are customization to each individual project. You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships, and guarantee your satisfaction!\n

Roof Replacement
Roof Replacement
Roof Replacement
Roof Replacement
Roof Replacement

+48

Response time8 hrs
Response rate100%
2 neighbors recently requested a quote
G L Construction Management
4.7(
3
)
Basement - Remodel

Serving Weston, OH and surrounding areas

In business since 2016

Free estimates

Emergency services offered

"G L Construction Management was such a great company to work with! I had numerous services completed by them in many rooms of my home. Very professional and friendly company. I wanted several things done before I moved into my new home and they worked very quickly to get me and my child settled in before Chrismas. I would recommend them for any household construction needs."
Garage / Shed Build Project
Kitchen and Bath Remodeling Project
Kitchen and Bath Remodeling Project
Kitchen and Bath Remodeling Project
Kitchen and Bath Remodeling Project

+23

Recommended by100%of homeowners
...
Showing 1-10 of 67
Basement Remodel questions, answered by experts

Yes, adding a walkout basement will usually bump up your property value. Most homeowners prefer walk out basements because the exposed wall that’s level with the ground provides more utility via a ground-level exterior entrance, and they can fit full windows, which adds natural light and ventilation to the basement area. The only exception might be in areas prone to tornadoes, as walkout basements aren’t as safe as regular basements during a tornado, particularly if they include large windows or glass sliding doors.

When considering finishing your basement, take into account a few pros and cons:

Pros

  • Can increase the value of your home

  • Separate space from the rest of the house 

  • Customize and personalize the basement to suit your needs and style

  • Increase the amount of living space in your home

Cons

  • May not regain enough value to cover the cost of finishing

  • Lack of natural light if it’s below ground level

  • Moisture or flooding can cause costly damage

  • Installing plumbing and electrical can be messy and costly

Building a bar in the basement will likely add value to your home, although it’s unlikely that you’ll see a significant return on investment (ROI) unless you plan on using the space for you and your guests. If you think you’ll use the area frequently, though, it’s probably worth the investment, and you should see a bump in value if or when you sell your property.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Yes, you can add a bathroom to an unfinished basement, but you’ll want to take proper precautions if doing so. As with any bathroom addition, you’ll need to make sure that it’s approved by local building authorities first. With unfinished basements, you especially need to keep an eye on proper ventilation practices.

The Weston, OH homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.