Top-rated basement remodelers.

Get matched with top basement remodelers in Mcclure, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Mcclure, OH?

Select your specific project to find the pro for you.

Find Basement remodelers in Mcclure

Avatar for Scott's General Services
Scott's General Services
4.2(
22
)
Basement - Remodel

Serving Mcclure, OH and surrounding areas

Approved

In business since 2015

Small jobs welcome

Customers say: Terrific value

"Scott did a fantastic job installing the drywall and painting the interior of the house. I hired him to do other projects as well and he has done a wonderful job with those projects as well. I will hire Scott for all of my home projects!"
Work Photos
Ottawa hills
Ottawa hills
Holland
Holland

+69

Response time2 days
Recommended by93%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Mcclure, OH and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 45
Basement Remodel questions, answered by experts

Yes, you can add a bathroom to an unfinished basement, but you’ll want to take proper precautions if doing so. As with any bathroom addition, you’ll need to make sure that it’s approved by local building authorities first. With unfinished basements, you especially need to keep an eye on proper ventilation practices.

When choosing materials for finishing basement walls, consider factors such as moisture resistance, durability, and fire resistance. Opt for materials specifically designed for basement environments, like moisture-resistant drywall or cement board. Insulation with vapor barriers can help regulate temperature and prevent condensation. Consider using mold-resistant paints or coatings. 

Research and consult with experts to select materials that are suitable for your specific basement conditions and intended use. Prioritize quality and compatibility to achieve long-lasting and aesthetically pleasing results.

Create a checklist, reimagine the space use, set a realistic budget, choose materials and aesthetic details, and get professional support for guidelines and troubleshooting.

Yes, adding a walkout basement will usually bump up your property value. Most homeowners prefer walk out basements because the exposed wall that’s level with the ground provides more utility via a ground-level exterior entrance, and they can fit full windows, which adds natural light and ventilation to the basement area. The only exception might be in areas prone to tornadoes, as walkout basements aren’t as safe as regular basements during a tornado, particularly if they include large windows or glass sliding doors.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Mcclure, OH homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.