Top-rated basement remodelers.

Get matched with top basement remodelers in Defiance, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Defiance, OH?

Select your specific project to find the pro for you.

Find Basement remodelers in Defiance

Avatar for Mid-State Basement Systems
Mid-State Basement Systems
5.0(
13
)
Basement - Remodel

Serving Defiance, OH and surrounding areas

Approved

In business since 1986

Free estimates

Emergency services offered

"Positive: Professionalism, Punctuality, Quality, Responsiveness, Value I took multiple bids on my basement project across basement companies in Columbus. Mid state basement systems had the best and most fair pricing. They did not use any scare tactics and were upfront and honest. They were also the only company to use a laser level and show me the sag difference in my joists that I was experiencing. I hired mid-state basement systems to do crawl space support and repair on my load bearing wall in my basement. MY PROBLEM WAS UNIQUE AS LOAD BEARING WALLS NORMALLY DO NOT NEED TO BE REPAIRED LIKE THIS! At first, it was not level upon completion (BARELY 1/8 INCH OFF) in ONE spot and I let my sales rep Jiovanni know. the team came back out within 48 hrs and adjusted everything and let me take a look at it. They did a fantastic job. The installation crew even wiped down my floors for me after they were done! They were so polite, and respectful and made sure there was no damage to anything as they were moving steel beams to my basement ( my fridge was an object in the way to the basement door ) Do not let competitors make you question the validity of this business. they were fantastic. Rating of sales 5/5 Rating of the installation crew 5/5 Rating of management 5/5 Rating of mid-state as a company : 10/5 I do not believe I would have received this level of responsiveness of any of the competitors. I would choose mid-state basements for any basement project I had. Please use my review to know that mid-state basement systems will do the job the right way and how you need it to be done. In my experience, they offer the most fair pricing."
Before
After
Foundation Before
Foundation After
Modernized Basement

+6

Response time2 hrs
Response rate100%
4 neighbors recently requested a quote
Eagle Wings handyman services
5.0(
5
)
Basement - Remodel

Serving Defiance, OH and surrounding areas

Approved

Emergency services offered

Customers say: True professional

"Everything was great! Arlyn was able to come out the same day I contacted him and had a very fair rate! He worked with me on the best placement and was very patient when I asked for changes. He was prompt, respectful and the finished playset is PERFECT!!! Can't thank them enough!"
Window repair
Before
Pressure washing
Window repair
Garage remodel

+8

Response time1 day
Recommended by100%of homeowners
Avatar for Buckeye Waterproofing Inc
Buckeye Waterproofing Inc
4.1(
54
)
Basement - Remodel

Serving Defiance, OH and surrounding areas

In business since 2003

Free estimates

Emergency services offered

"Upon discovering water leaking into my basement i contacted buckeye waterproofing. Jerry Schieve, field supervisor came out and gave an estimate and scheduled the work.. Within 2 weeks the crew was at my home working. IT took 3 days to complete and everything went well.
"
Recommended by76%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Defiance, OH and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for DECKadent Outdoor Living
DECKadent Outdoor Living
5.0(
5
)
Basement - Remodel

Serving Defiance, OH and surrounding areas

In business since 2024

Free estimates

Credit card accepted

"their Fence repair work was better than the company who did the initial install. Reach out to them for any need you might have great to do business with , i will choose them again"
Response time2 days
Recommended by100%of homeowners
Showing 1-10 of 40
Basement Remodel questions, answered by experts

Egress windows or doors are required in finished basements to meet safety and building codes. If your basement is unfinished and used as a storage space, egress windows are not required, but anything considered a habitable space must have an additional point of egress in addition to the stairs.

Home improvements that increase value offer a high return on investment (ROI) and can enhance your quality of life. Upgrades to your home’s curb appeal often add the most value, with garage door replacement having one of the best ROIs at 93%. Other high-value exterior projects include replacing your front door, upgrading siding and roofing, installing a stone veneer, adding new windows, and landscaping. For interior renovations, a fresh coat of paint provides an excellent ROI. Major projects like a kitchen remodel or upgrading appliances and HVAC systems also add significant value, as potential buyers appreciate the peace of mind that new equipment provides.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Costs are guided by renovation scope, materials chosen, project duration, structural needs, and labor. Prioritizing tasks prevents unforeseen expenses.

While bathrooms and kitchens are nearly equal in terms of renovation difficulty, kitchens are the most challenging. Kitchen design, layout, electrical, and plumbing needs all depend on each other for the success of the entire project, and mistakes early in the project can cause trouble later on.

The Defiance, OH homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.