Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Houston, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Houston, OH?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Houston

Avatar for American Driveway of Columbus
American Driveway of Columbus
4.5(
264
)
Concrete Driveways - Install

Serving Houston, OH and surrounding areas

Approved (Corporate)

In business since 2016

Free estimates

Small jobs welcome

"Most of what we do is full tear-out and replacement. We remove the old cracked, settling, or spalling concrete, rebuild the base the right way, and pour new. We also handle driveway extensions and widening, aprons and curb cuts, stamped and decorative concrete, and concrete repair.\n\nOur crews have poured more than 38,000 residential concrete projects. Every job gets a dedicated project coordinator, up-front pricing with no surprise change orders, and a final walkthrough before we call it finished. Licensed and insured.\n\nNeed a new driveway? Request a free estimate and we'll measure your property and give you a real number — not a range."

10 neighbors recently requested a quote
Recommended by94%of homeowners
Miller Concrete & Construction
5.0(
1
)
Concrete Driveways & Floors - Install- For Business

Serving Houston, OH and surrounding areas

Approved

In business since 2005

Free estimates

Offers commercial services

Miller Concrete & Construction is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Avatar for Black sheep asphalt and seal coat
Black sheep asphalt and seal coat
New to Angi
Asphalt SealingAsphalt Paving - InstallAsphalt Paving - Repair or Patch+1 more

Serving Houston, OH and surrounding areas

Approved

Free estimates

Small jobs welcome

Credit card accepted

We are a small family owned company. With the ability to handle large scale jobs if needed. We offer a wide range of asphalt services like pot hole filling, crack repair, seal coat and line striping. Licensed and insured and the best cost to quality in the area.

2 neighbors recently requested a quote
...
Showing 1-10 of 100
Asphalt Driveways questions, answered by experts

Building a road on a slope requires careful planning and will normally require a drainage system underneath to prevent flooding and damage to the road over time. Your professional may lengthen your road to create switchbacks if the slope directly to your home is too steep, as there are regulations for maximum road slope. The drainage system will help prevent runoff from the higher side of the slope from damaging the asphalt or concrete. Keep in mind that building a road on a slope isn’t a good DIY project, as a lot can go wrong.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Houston, OH homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.