Top-rated subcontractors.

Get matched with top subcontractors in Flushing, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Flushing, OH?

Select your specific project to find the pro for you.

TRUSTED BY FLUSHING, OH HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon19
    Verified subcontracting services reviews

Find Subcontractors in Flushing

Avatar for Matthews-Gress Construction LLC
Matthews-Gress Construction LLC
New to Angi

Serving Flushing, OH and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

Don't settle for home you don't love. It's time for a transformation. At MG Construction, we specialize in complete home makeovers inside and out. Whether you need a modern kitchen update or a total landscape revival, we have the tools and team to make it happen.

1 neighbors recently requested a quote
Avatar for By All Means & More
By All Means & More
4.4(
75
)

Serving Flushing, OH and surrounding areas

In business since 2010

Free estimates

"I was a little weiry about going with another contractor in the first place,because I have been taken before. But I went ahead anyway and searched and found By all Means and More..... I called Chris and spoke with him about multiple projects I had and been wanting done for a year or so..... The experience was great when we met on are appointment.... Everything he said was going to take place and how it was going to go it did!.... The guys had a few hicups here and there but they figured it out with no problems.....Everything looks great...."
Pool deck
Deck
Second level deck
Deck
Siding

+47

Recommended by89%of homeowners
Avatar for W.H.A.S. Renovations
W.H.A.S. Renovations
4.7(
12
)

Serving Flushing, OH and surrounding areas

Free estimates

Credit card accepted

"I really can't say enough about Bob & Dustin. Bob is the Son in William Harris & Son and his professionalism, integrity & skills as a contractor are unsurpassed! I am so thankful that I found him and his company because although this project encountered hiccups, Bob not only made it right but saved me more money and headaches in the future. I have other home projects that need attention and I'm more than comfortable hiring WHAS to tackle this for me. I know the work will be done right & for the best price. WHAS has another customer for life now! BTW, WHAS honors military service, so hire them today!"
Laminate flooring
Wallpaper removal, drywall and electric
Flooring Sales and Installation Project
Gutters and insulation
Laminate flooring

+122

Recommended by90%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Flushing, OH and surrounding areas

In business since 2006

Credit card accepted

"The man I talked to was very professional and timely. However, he explained that this particular job was beyond the scope of what their company does. I would certainly use them on another 'issue'.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 36
Subcontractors questions, answered by experts

The process typically takes 2-6 weeks, depending on the project size and level of customization.

When conducting space planning, building codes and regulations need to be considered. As long as you are taking them into account and discussing them with the architect, you should be able to do your space planning appropriately.

It is technically possible to draw your own blueprints, but the process is extremely involved and really demands help from an expert. A professional architect has an understanding of design elements, interior design, the functionality of different rooms in a home, and how everything from furniture, outlets, and light switches should be laid out to serve you and your family best. Hiring an architect for blueprints can get expensive, but it’s the most responsible way to begin a new construction project. If you’re keen on DIYing, you could consider starting the process and then having a professional take over.

Most Greek Revival architecture homes are one and a half to two stories, depending on the footprint, which sets them apart from some Federal architecture homes that are three stories. The gabled roof on the second floor can sometimes cut into the living space, especially on smaller homes of this style, which leaves a much smaller living area upstairs.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

The Flushing, OH homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.