Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Spencer, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Spencer, NY?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Spencer

Avatar for WoodRock Construction
WoodRock Construction
5.0(
4
)
Concrete Driveways - Install

Serving Spencer, NY and surrounding areas

Approved

In business since 2024

Free estimates

Credit card accepted

"We had the front entrance to our home completely replaced, Matt was very attentive and helpful with the design and desired outcome we were looking to achieve. He is very knowledgeable and has an outstanding work ethic. Matt will be the first call we make for any future projects. Thank you Woodrock Construction!"
Residential concrete
Residential concrete
Residential concrete
Residential concrete
Residential concrete

+16

Response time1 day
Response rate100%
2 neighbors recently requested a quote
Ward's Construction, Inc.
5.0(
1
)
Concrete Driveways & Floors - Install- For Business

Serving Spencer, NY and surrounding areas

Approved

In business since 2000

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

Recommended by100%of homeowners
Avatar for Valley Dirt Works LLC
Valley Dirt Works LLC
4.8(
8
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Spencer, NY and surrounding areas

In business since 2023

Free estimates

Warranties offered

"I had a driveway taken out and replaced my Valley Dirt. The crew was the same everyday. That was nice cause I felt like I knew who was at my house everyday. They showed up when they said they would. The job was done in no time. Very polite and helped me with all my request with a great price!"
My jobs
My jobs
My jobs
My jobs
My jobs

+20

Response time9 hrs
Recommended by66%of homeowners
Avatar for Buddy's Quality Construction LLC
Buddy's Quality Construction LLC
5.0(
7
)
Asphalt Paving - Repair or PatchBrick and Stone Driveways & Floors - InstallConcrete Driveways & Floors - Install- For Business+5 more

Serving Spencer, NY and surrounding areas

In business since 2024

Free estimates

Warranties offered

"Keith did a large, heavily overgrown land clearing job for me. He was easy to work with, kept me advised at all times regarding start up, progress, issues, etc. His work was excellent, very professional. I would definitely recommend him to anyone who wants a job done, and done right."
Yeomans-Sewer
Yoemans-Sewer
Yeomans-sewer
Pratts-Clearing
Pratts-Clearing

+19

Response time1 day
Response rate96%
Recommended by100%of homeowners
...
Showing 1-10 of 72
Asphalt Driveways questions, answered by experts

This creates a risk for your driveway to fail after asphalt curing because it doesn't have a lasting bond with the surface. In order to get asphalt to perform as intended, it's necessary to prepare the dirt surface correctly first. The loose soil base under the new driveway must be compacted until it is stable enough to support the weight of the asphalt.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Depending on project size, typically 1 to 3 days, including preparation and installation.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Professionals restore the surface to a fresh, attractive finish by applying a new, even sealant layer.

The Spencer, NY homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.