Building an inground pool is a job best left to the pros. Excavating the area and building the pool requires heavy equipment and specialized training, and pools have complex plumbing and electrical systems. Unless you’re experienced in these areas, you’re better off hiring a pool contractor to make sure the job gets done safely and correctly. 

Yes, you will need building permits for an inground pool, and your pool installation company should pull them for you. The permit filing fee will usually sit between $400 and $1,800, and it should appear on your contract or invoice. You may want to confirm with your contractor that they will pull all necessary permits. You might also need a permit for a new fence, as many municipalities have special fencing requirements for properties with pools. A fence permit costs between $50 and $500. This expense may not be included in your pool installation estimate.

If you’re wondering how to find a leak in an aboveground pool, the process is the same as it is for an in-ground pool. Note that the vinyl liner in aboveground pools is fairly thin, so sharp objects easily puncture it. Additionally, the liner can wear down after constant exposure to pool chemicals, especially when chlorine levels are higher than they should be. For these reasons, small holes in the vinyl liner often cause leaks, but you can easily detect them with the dye test.

You can find a leak in an in-ground pool by doing a visual check, the bucket test, and a dye test. Keep in mind that skimmers are usually the culprit for in-ground pool leaks. However, if you cannot detect the leak location after running the tests, it’s a good idea to call in a professional pool repair service.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.