Top-rated subcontractors.

Get matched with top subcontractors in Greenwich, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Greenwich, NY?

Select your specific project to find the pro for you.

TRUSTED BY GREENWICH, NY HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon173
    Verified subcontracting services reviews

Find Subcontractors in Greenwich

Bowen Ridge Construction
4.6(
9
)
Major Home Repairs (General Contractor)

Serving Greenwich, NY and surrounding areas

Approved

In business since 2016

Free estimates

Warranties offered

"As someone building a second home in Vt., everything needed to be done from a 235 mile distance. This can feel a little scary. My experience w/ Joe was Outstanding!!! Joe approaches all his tasks whether it be contract work or time & material work w/ the same set of ethics. Get it done in a timely fashion, be fair, communicate clearly, take regular pics, send via text for approval or comment, & offer advice through his experience as a seasoned builder. If you are lucky enough to work w/ Joe, enjoy the experience, your in good hands. Bill Giglio from Ct."
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project

+106

1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for DePaula Group LLC
DePaula Group LLC
5.0(
9
)
Major Home Repairs (General Contractor)

Serving Greenwich, NY and surrounding areas

In business since 2010

Free estimates

Emergency services offered

"Dan is incredible and I wouldn't recommend anyone else. He has one of the best eyes for design I've ever seen and all the work was completed quickly with no issues and the end result far exceeded my expectations. The renovations him and his team have done are the highlight of my condo. You won't meet someone who is more friendly and professional to work with. The next time I consider any renovations, Dan will be the first call I make."
Upstate Vacation Home
Kitchen
LOFT RENOVATION / FLATIRON
BK DREAM HOUSE
Marble and Granite Project

+29

Recommended by100%of homeowners
Avatar for J & A Carpentry Services, LLC
J & A Carpentry Services, LLC
5.0(
10
)
Major Home Repairs (General Contractor)

Serving Greenwich, NY and surrounding areas

In business since 2020

Free estimates

Credit card accepted

"Jeff and his crew were very accommodating and responsive to our questions, and always timely letting us know when he would be at our home. He built us beautiful deck on the back of our home that is very well constructed. Even our town building inspector was impressed, stating on his final inspection that "you can land a helicopter on this deck!". Thanks for a job well done...will not hesitate to hire again for future projects!"
Bathroom before remodel
Bathroom remodel
Bathroom remodel
Bathroom remodel
Bathroom remodel

+30

Response time3 days
Recommended by100%of homeowners
...
Showing 1-10 of 92
Subcontractors questions, answered by experts

Villa exterior features often include large windows, arched doorways, patios, terraces, greenery, and gardens. Common exterior colors for villas are whites and off-whites, soft browns, and clay tones. 

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

Yes, professionals offer custom designs, including lattice tops and decorative post caps.

Structural engineers draw structural plans, which include detailed drawings of the structural components of a home only. Complete house plans will require additional work from an architect or draftsperson, whose drawings will take the structural drawings into account. They’ll also include more details about the finishing materials and layout of a home, including everything from roofing and flooring materials to the position of furniture, light fixtures, switches, and plumbing fixtures.

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

The Greenwich, NY homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.