Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in De Kalb Junction, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in De Kalb Junction, NY?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in De Kalb Junction

Avatar for Full Service Paving Corporation
Full Service Paving Corporation
4.0(
14
)
Asphalt Paving - InstallAsphalt SealingAsphalt Paving - Repair or Patch+3 more

Serving De Kalb Junction, NY and surrounding areas

Approved

In business since 2019

Free estimates

Small jobs welcome

"Great job for a driveway that serves 7 cottages in Hammond. Very steep driveway with 3 turnouts to the different cottages. Awesome job under some extreme circumstances. Shaun & the crew were extremely professional and went beyond what was contracted for. Would highly recommend Full Service Paving."
Commercial Parking Lot
Site Work-- Agricultural
Site Work-- Agricultural
Paving-- Agricultural
Commercial Paving

+19

Response time2 days
28 neighbors recently requested a quote
Recommended by72%of homeowners
GCA Excavating & Land Clearing
5.0(
9
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving De Kalb Junction, NY and surrounding areas

Approved

In business since 2024

Free estimates

Offers commercial services

"I hored them to clear newly bought land so it could be mowed going forward. They came and did above and beyond. Very pleased withtheir work, professionalism, courtesy, and ability to complete the work on-time and for the budgeted amount."
Response time30 mins
5 neighbors recently requested a quote
Recommended by100%of homeowners
Noah Lamphear
New to Angi
Brick and Stone Driveways & Floors - Install

Serving De Kalb Junction, NY and surrounding areas

Approved

In business since 2018

Free estimates

Offers commercial services

Noah Lamphear is a locally owned and operated company that values honesty and integrity in all aspects of our business. Our dedicated team of professionals have over 10 years of hands on experience, to provide innovative ideas and suggestions tailored to your projects. Our services are customized to your individual needs, paying close attention to the details of each project that we are involved with. Please feel free to contact us today! \n\n\n\n

Showing 1-10 of 43
Asphalt Driveways questions, answered by experts

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

In terms of durability, concrete driveways can last more than 50 years when properly maintained, compared to the typical 30 years for an asphalt driveway. However, the durability depends on the climate, base material and thickness, and thickness of the concrete or asphalt used. The longevity of concrete or asphalt driveways also depends on how well it’s maintained and the amount of wear and tear it endures.

The material that’s best for your private road depends on your property, the climate in your area, and your personal preferences. Gravel is an affordable option, but some homeowners don’t like how it looks. It can be a pain to remove snow from, and it requires more ongoing maintenance than asphalt or concrete. However, while these other options require less maintenance and make snow removal a breeze, they’re more expensive and will need repairs from time to time. Ultimately, you’ll have to choose the road material that suits you and your property best.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Asphalt is made of aggregate materials (sand, rocks, and gravel) and bitumen, a viscous, petroleum-based, waterproof substance. These materials are mixed together at extremely high temperatures to form asphalt.

The De Kalb Junction, NY homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.