Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in De Kalb Junction, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in De Kalb Junction, NY?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in De Kalb Junction

Avatar for Full Service Paving Corporation
Full Service Paving Corporation
4.0(
14
)
Asphalt Paving - InstallAsphalt SealingAsphalt Paving - Repair or Patch+3 more

Serving De Kalb Junction, NY and surrounding areas

Approved

In business since 2019

Free estimates

Small jobs welcome

"Great job for a driveway that serves 7 cottages in Hammond. Very steep driveway with 3 turnouts to the different cottages. Awesome job under some extreme circumstances. Shaun & the crew were extremely professional and went beyond what was contracted for. Would highly recommend Full Service Paving."
Commercial Parking Lot
Site Work-- Agricultural
Site Work-- Agricultural
Paving-- Agricultural
Commercial Paving

+19

Response time2 days
28 neighbors recently requested a quote
Recommended by72%of homeowners
GCA Excavating & Land Clearing
5.0(
9
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving De Kalb Junction, NY and surrounding areas

Approved

In business since 2024

Free estimates

Offers commercial services

"I hored them to clear newly bought land so it could be mowed going forward. They came and did above and beyond. Very pleased withtheir work, professionalism, courtesy, and ability to complete the work on-time and for the budgeted amount."
Response time30 mins
5 neighbors recently requested a quote
Recommended by100%of homeowners
Noah Lamphear
New to Angi
Brick and Stone Driveways & Floors - Install

Serving De Kalb Junction, NY and surrounding areas

Approved

In business since 2018

Free estimates

Offers commercial services

Noah Lamphear is a locally owned and operated company that values honesty and integrity in all aspects of our business. Our dedicated team of professionals have over 10 years of hands on experience, to provide innovative ideas and suggestions tailored to your projects. Our services are customized to your individual needs, paying close attention to the details of each project that we are involved with. Please feel free to contact us today! \n\n\n\n

Showing 1-10 of 43
Asphalt Driveways questions, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

Driveway aprons typically range between four and seven inches thick, though your town's building codes will likely have specific requirements. Additionally, you may need to add a layer of permeable aggregate in the excavation below your paved apron to ensure proper stormwater drainage.

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

The De Kalb Junction, NY homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.