Top-rated basement remodelers.

Get matched with top basement remodelers in Ancram, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Ancram, NY?

Select your specific project to find the pro for you.

Find Basement remodelers in Ancram

Avatar for Riemer Contracting, LLC
Riemer Contracting, LLC
4.7(
63
)
Basement - Remodel

Serving Ancram, NY and surrounding areas

Approved

Super Service Award Winner

In business since 1948

Free estimates

Emergency services offered

"I can NOT say enough kind words about Daniel and his employees. Whatever I have dreamed to design they make it happen! I started with a horse barn remodel and now it's a place people come to see! The talent of this company and professionalism is first class. My list of renovations keeps going and they have been on time, worked long days and are so professional!"
Bathroom
Composite with hog fence railing
Composite with hog fence railing
Composite with hog fence
Stairs with pvc

+24

Response time6 hrs
21 neighbors recently requested a quote
Recommended by66%of homeowners
Avatar for JAM
JAM
0.5(
1
)
Basement - Remodel

Serving Ancram, NY and surrounding areas

Approved

In business since 2008

Free estimates

Emergency services offered

We invite you to experience a tradition of customer satisfaction that will exceed your greatest expectations. Our professionalism and quality workmanship will accurately reflect your taste and lifestyle. From conception to completion we work with you until the job is done. We thrive to take care of all of our clients unique needs. We are ethical, honest and easy to communicate with. Call us today you'll be pleased you did. Thank you

Response time10 mins
Response rate100%
Avatar for Stoney Brook R&D LLC
Stoney Brook R&D LLC
4.7(
17
)
Basement - Remodel

Serving Ancram, NY and surrounding areas

In business since 1990

Free estimates

Emergency services offered

"The deck came out beautifully! I hired Stoney Brook to start the deck construction in November expecting that construction wouldn’t happen until the spring. They actually began the engineering drawings and permitting process over the holidays and dug the footings (partially using a jackhammer) in the coldest week of the winter in January. The only snag occurred when the shipment of flooring material was not enough to cover the framing, creating a 2 week delay for more flooring material to arrive. However, it was still the middle of March, and the rest of the material arrived last week, enabling completion at the end of the week. So the deck was completed just in time for spring instead of having construction drag on into the spring and possibly summer."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+59

Recommended by94%of homeowners
Avatar for Shapiro Construction
Shapiro Construction
4.5(
24
)
Basement - Remodel

Serving Ancram, NY and surrounding areas

In business since 2012

Free estimates

Warranties offered

"Dan did an amazing job with our project! He built a solid, level foundation and constructed a large shed with loft area. He was skilled, efficient, dependable, and knowledgeable. And also just an all around cool, friendly person to work with. We would not hesitate to call him for additional projects!"
Handymen Project
Handymen Project
Remodeling - General Project
Heating & A/C Project
Remodeling - General Project

+52

Response time1 day
Recommended by95%of homeowners
Avatar for The Buxton Ventures, LLC
The Buxton Ventures, LLC
5.0(
5
)
Basement - Remodel

Serving Ancram, NY and surrounding areas

In business since 2018

Free estimates

"Customer service was excellent very respectful and nice people Couldn't be happier with the results, they were very reliable and kept me informed throughout the project.""Your team was courteous and cleaned up meticulously after each day. Highly recommend"
Pictures of our work
Pictures of our work
Pictures of our work
Pictures of our work
Pictures of our work

+28

Response time3 hrs
...
Showing 1-10 of 80
Basement Remodel questions, answered by experts

The most challenging part of finishing a basement is addressing moisture control. Basement waterproofing is an essential task that requires a professional’s skills and knowledge. If you don’t properly waterproof your finished basement, it’ll be vulnerable to dampness, water damage, and mold growth. Ensuring proper insulation and ventilation to combat these issues while meeting building codes adds complexity to your remodeling project.

If you’re not sure which method of raising the ceiling is best for you, here are a couple of considerations to help you make that decision. A professional ceiling company will be able to help you determine the best option for your home.

  • How long you are planning to live there: although raising the basement ceiling will increase the value of your home, if you’re planning to sell the house, then go for raising the house.

  • The condition of the foundation: to lower the floors, your foundation has to be intact whereas raising the house will allow you to restore the damaged foundation.

Yes, you can install a summer kitchen or kitchenette in your basement. They serve similar purposes as outdoor kitchens, keeping the main floor of the house cool and providing another space to cook and congregate. Basement kitchens are also a worthwhile alternative for homeowners without much space in the backyard. They come with a few logistical questions to sort out, though, like ventilation and waterproofing.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Adding a bathroom to your basement can increase your home value since homes with multiple bathrooms sell for more. The return on investment (ROI) for a basement bathroom is 50% to 75%. The actual return varies with your home and location. Adding a half bath to your home increases the value by 2.9% while finishing a basement increases the home value by 6.6%.

The Ancram, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.