Get matched with top concrete leveling pros in Portales, NM
Top-rated concrete leveling pros.

Need a pro for your concrete leveling project in Portales, NM?

Select your specific project to find the pro for you.

Find Concrete leveling pros in Portales

Avatar for Groundworks
Groundworks
New to Angi

Serving Portales, NM and surrounding areas

Approved (Corporate)

In business since 2017

Free estimates

Warranties offered

Groundworks is the North America?s leading and fastest-growing foundation repair and water management solutions provider. Groundworks is a vertically integrated company with its own manufacturing operations and a world-class software solution, allowing us to serve our customers more effectively. From the first phone call to the annual maintenance offered, our customers have peace of mind knowing we?re there with one mission ? to repair, protect and improve their home.\nFor state licenses visit Groundworks.com/licensing\n

Basement
Basement
Basement
Basement
Concrete

+16

24 neighbors recently requested a quote
Concrete Leveling questions, answered by experts

The polyurethane used for polyjacking will expand and cure in 15 to 30 minutes. After that point, your slab will be safe to walk on and even drive on in the case of a sidewalk or concrete driveway. Double-check with your concrete lifting specialist to confirm a curing timeline, as products can differ.

It’s best not to perform mudjacking in the winter unless the ground temperature remains above freezing. Freezing temperatures can cause the slurry to harden too quickly, compromising its strength and longevity. Concrete is also more susceptible to cracking and splitting in cold temperatures, so there’s a higher risk of damaging the slab during the drilling and lifting process in winter.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Many contractors offer warranties for their work. Confirm terms before starting the project.

The Portales, NM homeowners’ guide to concrete leveling services

From average costs to expert advice, get all the answers you need to get your job done.