Get matched with top subcontractors in Artesia, NM

Artesia homeowners rate subcontractors in our network

4.0

(36 reviews)

Top-rated subcontractors.

Need a pro for your subcontracting project in Artesia, NM?

Select your specific project to find the pro for you.

Find Subcontractors in Artesia

Babcock Construction
4.7(
41
)

Serving Artesia, NM and surrounding areas

Approved

In business since 1968

Free estimates

Credit card accepted

"Three generations of Babcocks are involved in this business and working with them was delightful. They responded promptly to our initial inquiry via Angie's List and quickly arranged some initial work so we could have a floor installed. They helped us design a new kitchen and built cabinets to fit it. They also built custom bookshelves for our library. Their work is first-rate. They were efficient and imaginative. Prices were fair and their subcontractors reliable. In short, they were the best contractors we have ever worked with."
Response time4 days
5 neighbors recently requested a quote
Recommended by93%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Artesia, NM and surrounding areas

In business since 2006

Credit card accepted

"I assumed that this was an actual vs virtual consultation. When I contacted vendor, he explained that this was a virtual consultation. He also apologized and told me that there had been a fair amount of confusion among Angie's list customers on this point. Vendor was courteous and accommodating."
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
SMRT Construction Services Inc.
3.3(
88
)

Serving Artesia, NM and surrounding areas

In business since 1984

Free estimates

Emergency services offered

"I wish that they had told me not to do it at all. They worked really hard, but they were not able to get it done. I did not know that it would cost so much to do the whole deck. It did not get the whole thing done. I was more preventative and they only did half of it. I did not know that it was going to take so long. I was only able to get half of it done, they did do what was said in the advertisement. I could not afford to have the rest of it done. It has been too difficult to deal with. I did pay for a couple of extra hours. They came out a couple of weeks after I made the purchase. The quality was good for what they were supposed to do."
Recommended by58%of homeowners
Showing 1-10 of 19
Subcontractors questions, answered by experts

There are several different steps in the pole barn building process. First, you’ll need construction plans, which you’ll use to obtain permits. Then, you can clear the land so it’s suitable for building and installing the foundation. Your contractor will frame the barn using large poles, then rough in the plumbing and electricity (if your barn has those elements) before finishing the interior, adding siding, and installing the roof. 

After that, they’ll finish up the electrical work and plumbing and add your windows and doors. You may have a few other finishing jobs to do like painting or waterproofing.

The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.

Mediterranean architecture comes from traditional building styles of countries on the Mediterranean Sea mixed with French, Greek, and Moroccan influences. There are three main types of Mediterranean architecture: Italian Renaissance, Spanish Revival, and modern.

Some signature components of Mediterranean architecture include red terra cotta roofs, archways, stucco siding, and metal detailing on windows. These homes often have balconies and outdoor living areas.

Yes, new home construction will always require building permits, no matter where you live. In most cases, you’ll need a general construction permit, along with plumbing and electrical permits for the utility lines in your home. Depending on where you live, you’ll likely find that you also need permits for things like connection to a sewage system or installing exterior components, like decks, driveways, patios, and curb cutouts. Leave navigating the permits required for new home construction to a professional to ensure your home is built legally and safely.

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

The Artesia, NM homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.