Top-rated excavation pros.

Get matched with top excavation pros in Belmar, NJ

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Belmar, NJ?

Select your specific project to find the pro for you.

TRUSTED BY BELMAR, NJ HOMEOWNERS

  • Average homeowner rating star icon4.1
    Average homeowner rating
  • Verified reviews icon21
    Verified excavation services reviews

Find Excavation pros in Belmar

Avatar for Tito & Son Construction, LLC
Tito & Son Construction, LLC
4.4(
41
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Belmar, NJ and surrounding areas

Approved

Super Service Award Winner

In business since 1979

Free estimates

Emergency services offered

"Amazing work! These guys came and within a few hours had the the gazebo fully assembled and drilled into the pavement. Zero error and took their time to make sure everything was straight an leveled. Very punctual, neat and responsible. Cannot wait to work with them again for future projects!"
Structural Beam
Structural Beam
Structural Beam
Bathroom Remodel
Bathroom Remodel

+42

Response time7 hrs
6 neighbors recently requested a quote
Recommended by74%of homeowners
...
Showing 1-10 of 130
Excavating questions, answered by experts

While general contractors sometimes handle demolition, you can also look specifically for local demolition contractors. Demolition experts need to understand structural integrity, the equipment needed for safe demolition, and the permits required for demolition.

Sewer lines can be buried anywhere from 18 inches to 8 feet deep, with a common average depth between 18 and 30 inches. The exact depth depends on local factors like climate and soil type. In colder regions, pipes must be buried deeper (below the frost line) to prevent freezing, sometimes as deep as 8 feet. The digging depth can also impact the cost of sewer line replacement. To find the specific depth for your property, you can check the building plans for your system, which should be on file with your city or local sanitation department since permits are required for installation.

Yes, professional installations include trenching or borehole drilling required for ground loops.

Above ground pools are not buried in the ground. Typically, above ground pools are semi-permanent. One reason they’re more affordable is that you don’t have to dig for an inground pool and pour concrete or another material. However, you can choose to install a semi inground pool, which is a hybrid between the two.

There are several different factors that influence how long it takes to excavate. For a foundation, it could take anywhere from three days to three weeks. It can take even longer if you face weather-related delays or an inaccessible site that’s riddled with boulders and rough terrain. It may also take longer if you have clay soil, which is more difficult to dig.

The Belmar, NJ homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.