Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Pembina, ND

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Pembina, ND?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Pembina

Finest Touch Painting
New to Angi
Concrete Floor Coating-Apply

Serving Pembina, ND and surrounding areas

In business since 2020

Free estimates

Credit card accepted

has a single mission: Complete Customer Satisfaction! We strongly believe in giving our customers the most for their money. So, we work with only the highest quality materials, experienced and professional craftsmen. We have consistently focused on the needs of our customers, providing personalized attention and a stress-free experience.

Epoxy Flooring questions, answered by experts

Epoxy paint is a popular option for concrete due to its durability and stain resistance. You can also use masonry paint, which adheres well to concrete. Acrylic paints are more affordable but not as durable. Concrete stain is another option, which is more durable than paint and won’t peel over time. 

Concrete coatings protect surfaces from wear, physical damage, abrasion, stains, spills, moisture, and weather. This protection extends the life of the concrete, adds durability, and can also improve aesthetics and safety.

Costs depend on coating type, labor, site preparation, and required finishes.

Resurfacing a garage floor takes about eight hours on average, with another couple hours over three days to do the epoxy. Epoxy goes on in three coats, with each coat taking 24 hours to dry and cure. You’ll need to keep foot and vehicle traffic off of your garage floor for around 4 days in total when replacing your garage floor, so be sure to plan ahead before you start. This is a great time to organize your garage since you’ll need to move everything out to apply the epoxy.

Self-leveling compound usually requires up to 24 hours to dry before you can begin installing tile. It’s best to follow the instructions on the self-leveling product label for appropriate dry time. If you’re still not sure, play it safe and give the self-leveling compound two days to dry before you begin the tiling process.

The Pembina, ND homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.