Top-rated epoxy flooring pros.

Best epoxy flooring pros near Lakota, ND

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Lakota, ND?

Select your specific project to find the pro for you.

Top-Rated Epoxy flooring pros in Lakota - Updated Nov 2026

Mike and Martin's Asphalt Paving and Sealcoating
4.0(
1
)
Concrete Finishing, Overlays & Coloring - ApplyConcrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Lakota, ND and surrounding areas

In business since 1976

Free estimates

We are a locally owned and operated company that values honesty, integrity and treats your home as if it were our own. We offer a variety of general contractor services that are customizable to each individual project. You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships and guarantee your satisfaction!

Response time8 hrs
Response rate88%
Recommended by100%of homeowners
Finest Touch Painting
New to Angi
Concrete Floor Coating-Apply

Serving Lakota, ND and surrounding areas

In business since 2020

Free estimates

Credit card accepted

has a single mission: Complete Customer Satisfaction! We strongly believe in giving our customers the most for their money. So, we work with only the highest quality materials, experienced and professional craftsmen. We have consistently focused on the needs of our customers, providing personalized attention and a stress-free experience.

Epoxy Flooring FAQs, answered by experts

Apply two coats of paint to a garage floor after priming for optimal results. The first coat serves as a base layer, providing adhesion and coverage. Allow the first coat to dry thoroughly before applying the second coat, typically after 12 to 24 hours. The second coat ensures even coverage and durability and enhances the floor's appearance. Additionally, applying two coats helps to create a more substantial barrier against stains, chemicals, and wear and tear, resulting in a longer-lasting finish. 

Resurfacing a garage floor takes about eight hours on average, with another couple hours over three days to do the epoxy. Epoxy goes on in three coats, with each coat taking 24 hours to dry and cure. You’ll need to keep foot and vehicle traffic off of your garage floor for around 4 days in total when replacing your garage floor, so be sure to plan ahead before you start. This is a great time to organize your garage since you’ll need to move everything out to apply the epoxy.

Professionals clean surfaces, apply primers for smooth adhesion, and coat with specialized materials that promise durability.

To keep your stamped concrete surfaces shiny, experts recommend resealing them every two or three years. Regularly cleaning your stamped concrete (at least twice per year, as part of routine maintenance) is another way to increase its sheen. Also, if you notice any spills or leaks, you should clean your stamped concrete as soon as possible to preserve its shine and prevent long-term damage.

Polished concrete gets its glass-like finish from several rounds of polishing, using increasingly finer grit diamond grinding pads. The concrete’s hardness will determine which grits you need to get your desired finish. The densifier and sealer also contribute to the look of the final floor, so either talk to a concrete pro (or hire one) to achieve the right concrete floor finish.

The Lakota, ND homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.