Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Mayville, ND

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Mayville, ND?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Mayville

Avatar for Custom Epoxy by Afrim
Custom Epoxy by Afrim
5.0(
4
)
Concrete Floor Coating-Apply

Serving Mayville, ND and surrounding areas

In business since 2016

Free estimates

Every design is custom to your Color Choices\n\nBeciraj Contracting is a well established company in West Fargo, which serves the surrounding communities too. We offer the best in customer service, as well as professionalism. Our company prides itself on integrity, and our work replicates that. Call us for your next job.

Projects
7 neighbors recently requested a quote
Recommended by100%of homeowners
Elskoes
New to Angi
Concrete Floor Coating-Apply

Serving Mayville, ND and surrounding areas

In business since 2008

Free estimates

Emergency services offered

Elskoes is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Showing 1-10 of 17
Epoxy Flooring questions, answered by experts

Yes, you can seal old or existing concrete, but proper preparation is crucial. The concrete surface must be clean, dry, and free of any incompatible old sealant. To check if an old sealer is present, drip a few drops of water onto the surface; if the water is absorbed in under five minutes, it's ready to be resealed. If you plan to use the same type of sealer that was previously applied, you may not need to remove the old layer. However, if you are using a different type of sealer, the old one must be completely removed. Before applying the new sealer, thoroughly clean the concrete and repair or fill any cracks to ensure a smooth, well-prepared surface.

Most coatings take 1-3 days, including surface preparation and drying time.

Flooring professionals can typically apply epoxy within one or two days, depending on how much preparation or repair the old floor needs before application. However, you’ll need to wait after the application is complete to use the flooring. While you can walk on the epoxy flooring before it fully cures, it can take up to 72 hours for the epoxy floor to fully dry and be ready for full use.

Yes, you can seal old concrete, but proper preparation is essential. Before sealing, ensure the concrete is clean, dry, and free of any old sealant. To check if resealing is necessary, place a few drops of water on the surface; if they are absorbed in less than five minutes, it's time to reseal. If you are using the same type of sealer that was previously applied, you may not need to remove the old layer. However, if you are applying a different type of sealer, the existing one must be removed. Additionally, repair or fill any cracks to create a smooth base before you begin sealing.

Coating enhancements often greatly benefit garages, patios, driveways, and commercial floors, elevating functional durability and curb appeal.

The Mayville, ND homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.