Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Mayville, ND

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Mayville, ND?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Mayville

Avatar for Custom Epoxy by Afrim
Custom Epoxy by Afrim
5.0(
4
)
Concrete Floor Coating-Apply

Serving Mayville, ND and surrounding areas

In business since 2016

Free estimates

Every design is custom to your Color Choices\n\nBeciraj Contracting is a well established company in West Fargo, which serves the surrounding communities too. We offer the best in customer service, as well as professionalism. Our company prides itself on integrity, and our work replicates that. Call us for your next job.

Projects
4 neighbors recently requested a quote
Recommended by100%of homeowners
Elskoes
New to Angi
Concrete Floor Coating-Apply

Serving Mayville, ND and surrounding areas

In business since 2008

Free estimates

Emergency services offered

Elskoes is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Showing 1-10 of 17
Epoxy Flooring questions, answered by experts

Depending on the finish and area size, costs range from $3 to $10 per square foot. Decorative finishes increase costs.

Yes. So-called “floating” cork floors can be installed over concrete subfloor, though a polyethylene vapor barrier is required. This type of installation is achieved using the glue-down tiles, which are trickier for a DIY approach, so consider calling a professional to help you if you’re planning to install your cork floor over concrete. 

Most coatings take 1-3 days, including surface preparation and drying time.

If your garage floor is heavily soiled or stained, then it’s a good idea to powerwash it with a concrete cleaner before sealing. This process will remove dirt and debris to help the new sealer bond to the concrete properly, and it will also improve the look of your sealed garage floor. After power washing your floor, make sure you let the concrete dry completely before applying sealant, usually for 24 to 48 hours.

Self-leveling compound usually requires up to 24 hours to dry before you can begin installing tile. It’s best to follow the instructions on the self-leveling product label for appropriate dry time. If you’re still not sure, play it safe and give the self-leveling compound two days to dry before you begin the tiling process.

The Mayville, ND homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.