"It was great, the pool technician was very helpful and kept us updated on what repairs were needed. He followed up after his visit to ensure we knew the next steps. 10/10 would have this technician again."
"They have been out for the electrical. They have been out for the pool. They have been out for the sump pump. Its the fee for the service call. We have used them for the last 3 years. If you have an appliance that you think needs replaced they will not replace it they will repair it to death. They are very responsive. Some of the people they send out are great, some are okay."
At C&C Roofing, our company is based on the belief that our customer's needs are of the utmost importance. Our team is committed to meeting those needs. We welcome the opportunity to earn your trust and deliver you the best service. No job is too big or too small for our experienced team. Call today for a quote.
Pool Construction and Installation questions, answered by experts
If you or your mortgage lender think your land survey needs to be more accurate, double-check the survey report and get at least a second opinion from the original surveyor and an inspector, if possible. Although it’s unlikely, even reputable surveying companies can make mistakes. An inaccurate survey can cause problems down the road in the case of any property line disputes, so it’s best to resolve any inaccuracies as quickly as possible.
If a buyer pays for a survey, the surveyor they hired will only provide results to them. It’s up to the buyer whether they share the survey results with the seller or not, even if they ultimately walk away from the deal. It’s considered good faith to share the results with the seller, though, especially if you back out of the deal, as the seller can then provide that survey to future interested parties.
The small lines on the tape measure either indicate inches, fractions of an inch, or centimeters and millimeters. On the imperial unit side (aka the inches side), the longest lines indicate inches, followed by the next shortest lines that indicate a half-inch, and then the quarter, eighth, and sixteenth-inch. On the metric side, the lines break down meters, centimeters, and millimeters.
Construction typically takes 3-6 months, including site preparation and assembly.
Depending on the type of land survey, the report will mark the boundaries of your property, the topographical changes of the landscape, as well as major natural and added structures to the plot. A more detailed survey, like an as-built survey, will note the measurements of the structures and landscape following major construction. A topographic survey will also help your contractor determine the cost of land development projects.
The Frazer, MT homeowners’ guide to pool constructions and installations
From average costs to expert advice, get all the answers you need to get your job done.
Semi-inground pools offer a nice balance of convenience and affordability. Use this guide to estimate semi-inground pool costs to transform your backyard.
Many factors affect indoor pool costs. From different types and shapes to installation and maintenance, here’s what to consider when pricing out your project.