"It was great, the pool technician was very helpful and kept us updated on what repairs were needed. He followed up after his visit to ensure we knew the next steps. 10/10 would have this technician again."
"They have been out for the electrical. They have been out for the pool. They have been out for the sump pump. Its the fee for the service call. We have used them for the last 3 years. If you have an appliance that you think needs replaced they will not replace it they will repair it to death. They are very responsive. Some of the people they send out are great, some are okay."
At C&C Roofing, our company is based on the belief that our customer's needs are of the utmost importance. Our team is committed to meeting those needs. We welcome the opportunity to earn your trust and deliver you the best service. No job is too big or too small for our experienced team. Call today for a quote.
Pool Construction and Installation FAQs, answered by experts
The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.
The small lines on the tape measure either indicate inches, fractions of an inch, or centimeters and millimeters. On the imperial unit side (aka the inches side), the longest lines indicate inches, followed by the next shortest lines that indicate a half-inch, and then the quarter, eighth, and sixteenth-inch. On the metric side, the lines break down meters, centimeters, and millimeters.
Land surveys are worth it in several scenarios including selling your home, building an addition, constructing a fence, or making major changes to your landscape. A professional land survey can help you avoid legal issues with your neighbors and confirm the value of your property. In many cases, you may be required to order a land survey to receive a construction permit or mortgage loan.
Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.
ALTA/ACSM surveys are the most comprehensive type of land survey and, as such, tend to be the most expensive. These surveys have standardized guidelines and reports and are used in many kinds of real estate transactions to ensure consistent and accurate information is available for properties.
The Jordan, MT homeowners’ guide to pool constructions and installations
From average costs to expert advice, get all the answers you need to get your job done.
Many factors affect indoor pool costs. From different types and shapes to installation and maintenance, here’s what to consider when pricing out your project.
Semi-inground pools offer a nice balance of convenience and affordability. Use this guide to estimate semi-inground pool costs to transform your backyard.
Stock tank pools are less expensive than traditional pool options. Find out stock tank pool costs and whether to go for professional installation or DIY.