Ostermiller Construction LLC in Shepherd, MT specializes in concrete, asphalt, curb, driveway, walkway, sidewalk, parking lot construction, and dirt work. We offer free estimates.\n\nWe serve in Shepherd, MT, Broadview Town MT; Roundup MT; Camp Three MT; Klein MT; and the surrounding areas.\n\nAsphalt Repair, Asphalt Contractor, Asphalt Driveway Repair, Asphalt Crack Repair, Parking Lot Asphalt Repair\nConcrete Service\n\nFor more information visit our website: https://constructionshepherdmt.com/
Driveway Sealcoating questions, answered by experts
Commercial lots should be sealed every 2-3 years to prevent cracks and weather damage.
It is not recommended to seal brand-new or uncured asphalt immediately after installation. You should wait at least three months to allow the asphalt time to cure. Applying a seal coat too soon can trap the asphalt's oils and chemicals, preventing it from fully hardening. This can lead to a weaker surface that is more vulnerable to damage. After the initial three-month curing period, applying a seal coat can extend the asphalt's life by protecting it from water, UV rays, and other damaging elements.
You should contact your driveway installer before winterizing a newly installed driveway. Winterizing it before the asphalt or concrete has fully cured can damage the driveway. But in many cases, you don't need to winterize a newly installed driveway anyway since it's likely freshly sealed and won't have much damage yet.
Costs depend on lot size, sealant quality, labor, and any additional surface preparation.
Ideally, you should seal your driveway when there won’t be rain for several days, but at a minimum, there can’t be rain for at least 24 hours. If it rains shortly after you seal your driveway, the water can wash away the sealer and render your work useless. You’ll have to wait for your driveway to dry out and try applying again. Note that some sealers—like oil-based sealers or specialty fast-drying sealers—may cure faster. Ask your contractor for information on timing before the install, and if there’s rain in the forecast, postpone the job.
The Circle, MT homeowners’ guide to driveway sealcoating
From average costs to expert advice, get all the answers you need to get your job done.
The cost of a tar and chip driveway falls between gravel and asphalt. Is this unique process the happy medium you've been looking for? Let's take a look.
The average driveway coating takes between 30 minutes and eight hours to dry, but weather and sealant type can influence the dry time. Read on to learn more.