Ostermiller Construction LLC in Shepherd, MT specializes in concrete, asphalt, curb, driveway, walkway, sidewalk, parking lot construction, and dirt work. We offer free estimates.\n\nWe serve in Shepherd, MT, Broadview Town MT; Roundup MT; Camp Three MT; Klein MT; and the surrounding areas.\n\nAsphalt Repair, Asphalt Contractor, Asphalt Driveway Repair, Asphalt Crack Repair, Parking Lot Asphalt Repair\nConcrete Service\n\nFor more information visit our website: https://constructionshepherdmt.com/
Driveway Sealcoating questions, answered by experts
Chip seal lasts only 5 to 8 years on average. This lifespan is significantly shorter than asphalt. It is also less durable. Therefore, chip seal driveway only works if the traffic volume is extremely low. Chip seal is also less resistant to storms and hails. As impact builds up, the chips may become misplaced, creating an uneven driving surface that sometimes becomes hazardous and may damage your tires or cause your vehicle to lose balance.
Many services include sealing as part of the repair process. Confirm with your contractor.
Access to commercial-grade products and equipment, ensuring thorough coverage and long-lasting protection.
Commercial lots should be sealed every 2-3 years to prevent cracks and weather damage.
The best time to seal a driveway is during periods of mild, dry weather, typically from late spring through early fall. For the sealant to bond and cure properly, it needs warm conditions. Avoid sealing in the winter when temperatures are too low.
For optimal results, follow these guidelines:
Temperature: Apply sealant when air and surface temperatures are consistently above a minimum of 50-55°F. The ideal range is often between 60°F and 80°F. Avoid applying sealer in extreme heat (above 90-95°F), as it can cause the sealant to dry too quickly and improperly.
Weather: Choose a time with no rain in the forecast for at least 24 to 48 hours after application. Rain can wash away the sealant before it has fully cured.
Timing and Cost: While spring and fall offer ideal temperatures, they are also the busiest seasons for driveway sealing companies, which may lead to higher costs due to increased demand. The best specific month will depend on your local climate.
The Circle, MT homeowners’ guide to driveway sealcoating
From average costs to expert advice, get all the answers you need to get your job done.
The cost of a tar and chip driveway falls between gravel and asphalt. Is this unique process the happy medium you've been looking for? Let's take a look.
The average driveway coating takes between 30 minutes and eight hours to dry, but weather and sealant type can influence the dry time. Read on to learn more.