Ostermiller Construction LLC in Shepherd, MT specializes in concrete, asphalt, curb, driveway, walkway, sidewalk, parking lot construction, and dirt work. We offer free estimates.\n\nWe serve in Shepherd, MT, Broadview Town MT; Roundup MT; Camp Three MT; Klein MT; and the surrounding areas.\n\nAsphalt Repair, Asphalt Contractor, Asphalt Driveway Repair, Asphalt Crack Repair, Parking Lot Asphalt Repair\nConcrete Service\n\nFor more information visit our website: https://constructionshepherdmt.com/
Driveway Sealcoating questions, answered by experts
To maintain your asphalt driveway, add a new coat of sealant every three to five years. Pricing varies, but you will pay about $0.08 to $0.50 per square foot from start to finish. You can also choose to add a fill-and-seal layer that includes a layer of aggregate to fortify a damaged top layer of asphalt.
It is not recommended to seal brand-new asphalt immediately. You should wait at least three months after installation to allow the asphalt time to cure properly. Applying a seal coat too soon can trap the asphalt's oils and chemicals, preventing it from fully hardening. This can result in a weaker surface that is more susceptible to damage. After the three-month curing period, sealing the asphalt is beneficial as it can extend its lifespan by protecting it from water, UV rays, and other damaging elements.
What causes driveways to crack can vary by driveway material. Sealcoating with the right formula creates a protective "shell" over a driveway. Resealing a driveway on schedule helps to preserve its lifespan substantially by keeping it protected against damage from UV rays, motor oil, chemicals, hail, rain, snow, and more. If you don't reseal your driveway, this will lead to brittleness, cracking, and potholes that can eventually cause your driveway to fall apart.
Most sealing projects take 1-2 days, including drying time before allowing traffic.
It depends on the type of sealer. Some sealers can dry in as little as 4 hours, but many can take up to 48 hours to fully cure. To play it safe, don’t drive on your driveway for two days after sealing.
The Circle, MT homeowners’ guide to driveway sealcoating
From average costs to expert advice, get all the answers you need to get your job done.
The cost of a tar and chip driveway falls between gravel and asphalt. Is this unique process the happy medium you've been looking for? Let's take a look.
The average driveway coating takes between 30 minutes and eight hours to dry, but weather and sealant type can influence the dry time. Read on to learn more.