Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Black Eagle, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Black Eagle, MT?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Black Eagle

Double D Concrete
5.0(
1
)
Concrete Driveways - Install

Serving Black Eagle, MT and surrounding areas

In business since 1990

Free estimates

Credit card accepted

"I've been meaning to leave these guys a review and am just now getting there. They were doing work for a neighbor and I worked something out with them to do a repair on a heavily damaged front walkway to our house. The work was done quickly, thoroughly and for a very reasonable cost. I would not hesitate to use them again as their work is top notch."
Recommended by100%of homeowners
Showing 1-10 of 18
Asphalt Driveways questions, answered by experts

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Yes, a paved or repaved driveway can boost your home's value by increasing its curb appeal and the functionality of your outdoor space. A new driveway can add anywhere from $5,000 to $20,000 to a property's value. An old, crumbling driveway can be a red flag for potential buyers and inspectors.

The amount of value added depends on the materials used, the design, and local market conditions. Concrete is often cited as adding the most value due to its long lifespan, though asphalt may be more desirable in colder climates. The return on investment is greatest when replacing a driveway that is in poor condition; repaving a driveway that is already in good shape will not yield as significant an increase in value.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The material that’s best for your private road depends on your property, the climate in your area, and your personal preferences. Gravel is an affordable option, but some homeowners don’t like how it looks. It can be a pain to remove snow from, and it requires more ongoing maintenance than asphalt or concrete. However, while these other options require less maintenance and make snow removal a breeze, they’re more expensive and will need repairs from time to time. Ultimately, you’ll have to choose the road material that suits you and your property best.

The Black Eagle, MT homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.