Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in West Point, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in West Point, MS?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in West Point

Niser Polymer Floor Co
New to Angi
Concrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving West Point, MS and surrounding areas

In business since 1993

Free estimates

Credit card accepted

Niser Polymer Floor Co DBA Bo's Best Epoxy Flooring\n\nWe are an experienced crew and are excited to work with you on your project. Reliability and quality are our mission. Epoxy flooring is our expertise, check out all that we offer. I have been in business for over 30 years! Call for an estimate today! \n

Response time6 days
Showing 1-10 of 29
Epoxy Flooring questions, answered by experts

Unlike paint, concrete stain won’t peel off. Instead, the color absorbs into the surface of this porous building material. While it doesn’t peel, the stain only penetrates the top layer of concrete, and as the top of the concrete eventually wears away, so will the stain. However, this process is much slower than paint peeling, especially on low-traffic surfaces.

You can paint concrete with paint rollers. In fact, using paint rollers is considered one of the easiest ways to evenly apply paint on concrete. A paint roller with a 1/2- to 3/4-inch-thick nap—which is basically a fabric paint roller cover—is best for painting concrete. The thicker the nap, the more paint it can hold to fill those pesky concrete cracks and crevices.

The actual moisture level that is acceptable for your concrete floor depends on what primer or flooring material you plan to install above it. For this reason, you should check the manufacturer’s instructions for the exact details.

Generally, the moisture levels should be 3.5% to 4.5%, although it does vary. Some products can handle higher levels of moisture, so you should always test your concrete before purchasing your flooring materials.

Sealing the concrete before tiling is recommended to help it stand up against any water that may seep through the tiles or grout. After thoroughly cleaning the concrete with TSP, priming with a concrete primer will seal the concrete. Check the label on the primer to make sure it is also a sealant and follow the manufacturer’s instructions for application.

It typically takes 1-2 days to coat a concrete floor, including preparation and curing time.

The West Point, MS homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.