Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Crawford, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Crawford, MS?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Crawford

Niser Polymer Floor Co
New to Angi
Concrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Crawford, MS and surrounding areas

In business since 1993

Free estimates

Credit card accepted

Niser Polymer Floor Co DBA Bo's Best Epoxy Flooring\n\nWe are an experienced crew and are excited to work with you on your project. Reliability and quality are our mission. Epoxy flooring is our expertise, check out all that we offer. I have been in business for over 30 years! Call for an estimate today! \n

Response time6 days
Showing 1-10 of 25
Epoxy Flooring questions, answered by experts

It takes time for damage to accumulate on garage floors. After years without maintenance, they will show cracks, stains, and moisture damage while collecting layers of dust along the surface.

New flooring costs quite a bit, so longevity is important to think about. Concrete generally has the longest life span, but it’s not always a good solution for homes with wooden subfloors. That said, hardwood floors and stone floors can last up to 100 years, and you can refinish or restore them to remove imperfections from daily wear.

The actual moisture level that is acceptable for your concrete floor depends on what primer or flooring material you plan to install above it. For this reason, you should check the manufacturer’s instructions for the exact details.

Generally, the moisture levels should be 3.5% to 4.5%, although it does vary. Some products can handle higher levels of moisture, so you should always test your concrete before purchasing your flooring materials.

Flooring professionals can typically apply epoxy within one or two days, depending on how much preparation or repair the old floor needs before application. However, you’ll need to wait after the application is complete to use the flooring. While you can walk on the epoxy flooring before it fully cures, it can take up to 72 hours for the epoxy floor to fully dry and be ready for full use.

Most coatings take 1-3 days, including surface preparation and drying time.

The Crawford, MS homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.