Niser Polymer Floor Co
New to Angi
Concrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Crawford, MS and surrounding areas

In business since 1993

Free estimates

Credit card accepted

Niser Polymer Floor Co DBA Bo's Best Epoxy Flooring\n\nWe are an experienced crew and are excited to work with you on your project. Reliability and quality are our mission. Epoxy flooring is our expertise, check out all that we offer. I have been in business for over 30 years! Call for an estimate today! \n

Response time6 days
Showing 1-10 of 25
Epoxy Flooring questions, answered by experts

The best time to seal your concrete driveway is sometime in the spring and fall when the temperature is above 55 degrees Fahrenheit. Keep an eye on the weather, and be sure to pick a day without rain on the forecast for at least 24 hours. Lastly, be sure you can leave the space free of foot and car traffic for the full drying time.

You can paint over old paint on a concrete porch. For the best results, you should first clean the surface and remove as much paint as you can. A power washer is helpful here, but you’ll also want to scrape as much of the old paint away as possible. Then you should prime the porch before repainting it.

Most concrete sealers take about one to three hours to dry. However, those that penetrate may take up to 48 hours or more to completely dry. You can find specific drying details from the manufacturer on the label.

To properly maintain an epoxy garage floor, regularly sweep up dirt and debris using a broom and dustpan or a vacuum cleaner. Mop with warm water and scrub away stains using a mild cleaning solution that's safe for the epoxy product you have installed. Don't use any soap-based or chemical cleaners, as these can cause the epoxy surface to deteriorate more rapidly.

The concrete coating process typically requires anywhere from a few hours to multiple days to complete, depending on the size of the area, environmental conditions, and the specific type of coating being applied. Preparatory work, curing times, and the number of coats needed also influence the overall timeline.

The Crawford, MS homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.