Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Wesson, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Wesson, MS?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Wesson

Avatar for J And B Equipment, LLC
J And B Equipment, LLC
3.0(
2
)

Serving Wesson, MS and surrounding areas

In business since 2014

Free estimates

Credit card accepted

"Wonderful. We had a contractor do us wrong on our roof two years ago. Jonathan and Brandy took the tin off and rebuilt all the braces and fixed it perfect. He and his crew did a wonderful job at a great price. I will call him for anything I need. He does great quality work."
Clean up after storm
Driveway
Clean up after storm
Recommended by50%of homeowners
Asphalt Driveways questions, answered by experts

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

An asphalt overlay or top coat costs between $3 and $7 per square foot. For a standard, single-car driveway that’s 10 feet wide and 20 feet long, that’s a total of between $600 and $1,400. For a two-car driveway, you’re looking at a total of between $1,200 and $3,000.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

This creates a risk for your driveway to fail after asphalt curing because it doesn't have a lasting bond with the surface. In order to get asphalt to perform as intended, it's necessary to prepare the dirt surface correctly first. The loose soil base under the new driveway must be compacted until it is stable enough to support the weight of the asphalt.

When comparing installation costs, asphalt is often less expensive upfront than concrete. Asphalt prices typically range from $7 to $15 per square foot, while concrete can range from $3 to $18 per square foot. However, long-term costs should also be considered. Concrete driveways generally last longer (up to twice as long) and require less maintenance, which can make them more affordable over their lifespan. While asphalt has a lower installation cost and is easier to repair, it requires more frequent maintenance, such as sealing, which can add up over time. Therefore, while concrete is more expensive initially, its durability may offset the cost in the long run.

The Wesson, MS homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"