Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Bogue Chitto, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Bogue Chitto, MS?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Bogue Chitto

Avatar for Pavement Maintenance Unlimited, LLC
Pavement Maintenance Unlimited, LLC
4.8(
4
)
Asphalt Sealing

Serving Bogue Chitto, MS and surrounding areas

Approved

In business since 1997

Free estimates

Credit card accepted

"Mike R was a delight to work with. Answered all calls and texts promptly, honest and experienced. His crew was fantastic. They were professional, courteous and hardworking. They had to adjust to using their equipment in a tight space and did it with ease. The job encountered an obstacle and Mike stuck to our agreed budget and fixed the problem. Such a pleasure to work with overall and the driveway looks great. Very happy customer"
Side Lot
Front Lot
Shoulder
Unprepared Crack
Shoulder

+8

Response time4 days
Recommended by100%of homeowners
...
Showing 1-10 of 59
Asphalt Driveways questions, answered by experts

With proper maintenance, asphalt milling driveways can last 30 years or more. Over time, you’ll need to regularly sealcoat your driveway. You should also have your driveway inspected every few years and make any repairs as soon as they are necessary; this will prolong the lifespan of your driveway.

If your driveway is cracked, you can repave it with a process called asphalt overlay. Overlay is more cost-effective than a full replacement but is better suited for minor cracks and issues. If you have major cracks or other problems like water pooling, asphalt overlay isn’t your best bet. Plus, paving over a cracked driveway only extends the lifetime by about 10 years, whereas replacing it would start the clock over completely to give you up to 30 years.

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Your city or county will have guidelines about the minimum and maximum width and length of private roads. The average private road is 12 feet wide, and length, of course, depends on your property. Requirements also depend on the amount of traffic and types of vehicles your road experiences. Check with local ordinances before planning a road on your property.

The Bogue Chitto, MS homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.